ChargeCensus

Chuckanut Builders

Temporarily unavailable

EV charging station in Bellingham, Washington on the EV Connect network — 2 Level 2. US DOE AFDC station 417009.

At a glance

Chuckanut Builders is a public EV charging station at 1000 North State St in Bellingham, Washington, on the EV Connect network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as temporarily unavailable, open since Jul 25, 2025.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID417009
NetworkEV Connect
StatusTemporarily unavailable (T)
AccessPublic
Open dateJul 25, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

EV Connect

Operates 1,601 stations in the DOE registry — view the full network →

Location

Address
1000 North State St
ZIP
98225
Coordinates
48.74529, -122.48113

Within ~15 km

Nearby charging

What kind of charging does Chuckanut Builders offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 33% below the Washington average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Chuckanut Builders compare with other stations in Bellingham?

Bellingham has 100 charging stations in the DOE registry with 225 ports, the 7th-most of 244 cities and towns in Washington. Chuckanut Builders accounts for under 1% of the charging ports in Bellingham. EV Connect runs 5 stations in Bellingham. Statewide, Washington has 3,447 stations and 10,216 ports, the 6th-largest station count of the 51 states and DC. The biggest station in Washington, Pasco Wa Sdc in Pasco, has 144 ports.

Who operates Chuckanut Builders?

EV Connect operates 1,601 stations in the registry across 50 states, with 1,835 DC fast and 3,902 Level 2 ports in total. 94 of those stations are in Washington, 3% of the state's 3,447.

What does the “Temporarily unavailable” status mean?

“Temporarily unavailable” means the station exists but is reported as temporarily out of service. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 25, 2025, one of 557 stations in Washington with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Chuckanut Builders have?

Chuckanut Builders has 2 charging ports: 2 Level 2.

Does Chuckanut Builders have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Chuckanut Builders have?

Chuckanut Builders has J1772 connectors.

Is Chuckanut Builders open to the public?

Yes. Chuckanut Builders is listed with public access, and its status is temporarily unavailable.

Where is Chuckanut Builders?

Chuckanut Builders is at 1000 North State St, Bellingham, WA 98225. Its coordinates are 48.74529, -122.48113.

More EV charging around Bellingham

Working with Washington charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 417009, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Chuckanut Builders, Bellingham, WA (AFDC station 417009)”, https://chargecensus.com/stations/washington/chuckanut-builders-417009 (data as of October 12, 2026).