Capri Apartments
AvailableEV charging station in Kirkland, Washington on the ChargeLab network — 16 Level 2. US DOE AFDC station 456468.
At a glance
Capri Apartments is a public EV charging station at 324 Central Way in Kirkland, Washington, on the ChargeLab network. It has 16 charging ports (16 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 25, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 456468 |
| Network | ChargeLab |
| Status | Available (E) |
| Access | Public |
| Open date | Mar 25, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 324 Central Way
- City
- Kirkland
- State
- Washington
- ZIP
- 98033
- Coordinates
- 47.67654, -122.20708
Within ~15 km
Nearby charging
- 145th Shoreline MUR-70102 ports
OpConnect · Available
- Google52 ports
ChargePoint · Available
- City of Seattle - Muni Tower32 ports
Non-networked · Available
- Alexan Shoreline28 ports
OpConnect · Planned
- Google24 ports
ChargePoint · Available
- Google24 ports
ChargePoint · Available
What kind of charging does Capri Apartments offer?
Of its 16 ports, 16 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 5.4 times the Washington average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Capri Apartments compare with other stations in Kirkland?
Kirkland has 67 charging stations in the DOE registry with 294 ports, the 9th-most of 244 cities and towns in Washington. Capri Apartments accounts for 5% of the charging ports in Kirkland. ChargeLab runs 2 stations in Kirkland. Statewide, Washington has 3,447 stations and 10,216 ports, the 6th-largest station count of the 51 states and DC. The biggest station in Washington, Pasco Wa Sdc in Pasco, has 144 ports.
Who operates Capri Apartments?
ChargeLab operates 406 stations in the registry across 38 states, with 325 DC fast and 1,312 Level 2 ports in total. 21 of those stations are in Washington, under 1% of the state's 3,447. By port count this is the 10th-biggest ChargeLab station in the country.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 25, 2026, one of 657 stations in Washington with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Capri Apartments have?
Capri Apartments has 16 charging ports: 16 Level 2.
Does Capri Apartments have DC fast charging?
No. The registry lists no DC fast ports here; its 16 ports are all Level 2.
What connectors does Capri Apartments have?
Capri Apartments has J1772 connectors.
Is Capri Apartments open to the public?
Yes. Capri Apartments is listed with public access, and its status is available.
Where is Capri Apartments?
Capri Apartments is at 324 Central Way, Kirkland, WA 98033. Its coordinates are 47.67654, -122.20708.
More EV charging around Kirkland
Working with Washington charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 456468, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Capri Apartments, Kirkland, WA (AFDC station 456468)”, https://chargecensus.com/stations/washington/capri-apartments-456468 (data as of October 12, 2026).