Building 83
AvailableEV charging station in Redmond, Washington, not on a charging network — 12 Level 2. US DOE AFDC station 334164.
At a glance
Building 83 is a public EV charging station at 4480 154th Pl NE in Redmond, Washington, not attached to a charging network. It has 12 charging ports (12 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 8, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 334164 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Parking lot |
| Open date | Feb 8, 2024 |
| Last updated at source | Feb 12, 2025 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 4480 154th Pl NE
- City
- Redmond
- State
- Washington
- ZIP
- 98052
- Coordinates
- 47.64902, -122.13332
Within ~15 km
Nearby charging
- Google52 ports
ChargePoint · Available
Tesla Destination · Available
- Google24 ports
ChargePoint · Available
- Google24 ports
ChargePoint · Available
- The Meyden20 ports
Blink · Available
- AMLI Redmond Wy19 ports
Loop · Available
What kind of charging does Building 83 offer?
Of its 12 ports, 12 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 4 times the Washington average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a parking lot location.
How does Building 83 compare with other stations in Redmond?
Redmond has 106 charging stations in the DOE registry with 315 ports, the 6th-most of 244 cities and towns in Washington. Building 83 accounts for 4% of the charging ports in Redmond. Statewide, Washington has 3,447 stations and 10,216 ports, the 6th-largest station count of the 51 states and DC. The biggest station in Washington, Pasco Wa Sdc in Pasco, has 144 ports.
Who operates Building 83?
Building 83 is listed as non-networked: its chargers are not run through a charging-network account. Washington has 347 non-networked stations, 10% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 8, 2024, one of 456 stations in Washington with a 2024 open date. The station's record was last updated at the source on Feb 12, 2025.
Frequently asked questions
How many chargers does Building 83 have?
Building 83 has 12 charging ports: 12 Level 2.
Does Building 83 have DC fast charging?
No. The registry lists no DC fast ports here; its 12 ports are all Level 2.
What connectors does Building 83 have?
Building 83 has J1772 connectors.
Is Building 83 open to the public?
Yes. Building 83 is listed with public access, and its status is available.
Where is Building 83?
Building 83 is at 4480 154th Pl NE, Redmond, WA 98052. Its coordinates are 47.64902, -122.13332.
More EV charging around Redmond
Working with Washington charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 334164, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Building 83, Redmond, WA (AFDC station 334164)”, https://chargecensus.com/stations/washington/building-83-334164 (data as of October 12, 2026).