Ballinger Commons
AvailableEV charging station in Shoreline, Washington on the Blink network — 2 Level 2. US DOE AFDC station 316045.
At a glance
Ballinger Commons is a public EV charging station at 2405 North 202nd Place in Shoreline, Washington, on the Blink network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 28, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 316045 |
| Network | Blink |
| Status | Available (E) |
| Access | Public |
| Open date | Sep 28, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 2405 North 202nd Place
- City
- Shoreline
- State
- Washington
- ZIP
- 98133
- Coordinates
- 47.77635, -122.33231
Within ~15 km
Nearby charging
- 145th Shoreline MUR-70102 ports
OpConnect · Available
- Google52 ports
ChargePoint · Available
- Alexan Shoreline28 ports
OpConnect · Planned
- Google24 ports
ChargePoint · Available
- Google24 ports
ChargePoint · Available
- Avenue 5 - Tesla Destination21 ports
Tesla Destination · Available
What kind of charging does Ballinger Commons offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 33% below the Washington average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Ballinger Commons compare with other stations in Shoreline?
Shoreline has 17 charging stations in the DOE registry with 171 ports. Ballinger Commons accounts for 1% of the charging ports in Shoreline. Blink runs 5 stations in Shoreline. Statewide, Washington has 3,447 stations and 10,216 ports, the 6th-largest station count of the 51 states and DC. The biggest station in Washington, Pasco Wa Sdc in Pasco, has 144 ports.
Who operates Ballinger Commons?
Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 314 of those stations are in Washington, 9% of the state's 3,447.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 28, 2023, one of 489 stations in Washington with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Ballinger Commons have?
Ballinger Commons has 2 charging ports: 2 Level 2.
Does Ballinger Commons have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Ballinger Commons have?
Ballinger Commons has J1772 connectors.
Is Ballinger Commons open to the public?
Yes. Ballinger Commons is listed with public access, and its status is available.
Where is Ballinger Commons?
Ballinger Commons is at 2405 North 202nd Place, Shoreline, WA 98133. Its coordinates are 47.77635, -122.33231.
More EV charging around Shoreline
Working with Washington charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 316045, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Ballinger Commons, Shoreline, WA (AFDC station 316045)”, https://chargecensus.com/stations/washington/ballinger-commons-316045 (data as of October 12, 2026).