AgWest Farm Credit
AvailableEV charging station in Spokane, Washington, not on a charging network — 6 Level 2. US DOE AFDC station 313081.
At a glance
AgWest Farm Credit is a public EV charging station at 2001 Flint Rd in Spokane, Washington, not attached to a charging network. It has 6 charging ports (6 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 12, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 313081 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Parking lot |
| Open date | Oct 12, 2023 |
| Last updated at source | Feb 2, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: Free
Location
- Address
- 2001 Flint Rd
- City
- Spokane
- State
- Washington
- ZIP
- 99224
- Coordinates
- 47.63675, -117.53814
Within ~15 km
Nearby charging
- Fairchild AFB20 ports
Non-networked · Available
- Carbon Operations19 ports
Loop · Available
- Wendle Motors13 ports
Synergev · Available
- 803 N Post St Parking8 ports
Non-networked · Available
Tesla Supercharger · Available
- Women of Wisdom - WSU8 ports
OpConnect · Available
What kind of charging does AgWest Farm Credit offer?
Of its 6 ports, 6 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about twice the Washington average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a parking lot location.
How does AgWest Farm Credit compare with other stations in Spokane?
Spokane has 140 charging stations in the DOE registry with 356 ports, the 3rd-most of 244 cities and towns in Washington. AgWest Farm Credit accounts for 2% of the charging ports in Spokane. Statewide, Washington has 3,447 stations and 10,216 ports, the 6th-largest station count of the 51 states and DC. The biggest station in Washington, Pasco Wa Sdc in Pasco, has 144 ports.
Who operates AgWest Farm Credit?
AgWest Farm Credit is listed as non-networked: its chargers are not run through a charging-network account. Washington has 347 non-networked stations, 10% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 12, 2023, one of 489 stations in Washington with a 2023 open date. The station's record was last updated at the source on Feb 2, 2026.
Frequently asked questions
How many chargers does AgWest Farm Credit have?
AgWest Farm Credit has 6 charging ports: 6 Level 2.
Does AgWest Farm Credit have DC fast charging?
No. The registry lists no DC fast ports here; its 6 ports are all Level 2.
What connectors does AgWest Farm Credit have?
AgWest Farm Credit has J1772 connectors.
Is charging at AgWest Farm Credit free?
Pricing as reported to the DOE registry: Free.
Is AgWest Farm Credit open to the public?
Yes. AgWest Farm Credit is listed with public access, and its status is available.
Where is AgWest Farm Credit?
AgWest Farm Credit is at 2001 Flint Rd, Spokane, WA 99224. Its coordinates are 47.63675, -117.53814.
More EV charging around Spokane
Working with Washington charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 313081, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “AgWest Farm Credit, Spokane, WA (AFDC station 313081)”, https://chargecensus.com/stations/washington/agwest-farm-credit-313081 (data as of October 12, 2026).