ChargeCensus

520 Pike Tower

Available

EV charging station in Seattle, Washington on the Blink network — 4 Level 2. US DOE AFDC station 96348.

At a glance

520 Pike Tower is a public EV charging station at 520 Pike St. in Seattle, Washington, on the Blink network. It has 4 charging ports (4 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 3, 2017.

Total ports
4
DC fast
0
Level 2
4
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID96348
NetworkBlink
StatusAvailable (E)
AccessPublic
Open dateJun 3, 2017
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: Free

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
520 Pike St.
ZIP
98101
Coordinates
47.61110, -122.33489

Within ~15 km

Nearby charging

What kind of charging does 520 Pike Tower offer?

Of its 4 ports, 4 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 35% above the Washington average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”.

How does 520 Pike Tower compare with other stations in Seattle?

Seattle has 679 charging stations in the DOE registry with 1,890 ports, the most of 244 cities and towns in Washington. 520 Pike Tower accounts for under 1% of the charging ports in Seattle. Blink runs 74 stations in Seattle. Statewide, Washington has 3,447 stations and 10,216 ports, the 6th-largest station count of the 51 states and DC. The biggest station in Washington, Pasco Wa Sdc in Pasco, has 144 ports.

Who operates 520 Pike Tower?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 314 of those stations are in Washington, 9% of the state's 3,447.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 3, 2017, one of 66 stations in Washington with a 2017 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does 520 Pike Tower have?

520 Pike Tower has 4 charging ports: 4 Level 2.

Does 520 Pike Tower have DC fast charging?

No. The registry lists no DC fast ports here; its 4 ports are all Level 2.

What connectors does 520 Pike Tower have?

520 Pike Tower has J1772 connectors.

Is charging at 520 Pike Tower free?

Pricing as reported to the DOE registry: Free.

Is 520 Pike Tower open to the public?

Yes. 520 Pike Tower is listed with public access, and its status is available.

Where is 520 Pike Tower?

520 Pike Tower is at 520 Pike St., Seattle, WA 98101. Its coordinates are 47.61110, -122.33489.

More EV charging around Seattle

Working with Washington charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 96348, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “520 Pike Tower, Seattle, WA (AFDC station 96348)”, https://chargecensus.com/stations/washington/520-pike-tower-96348 (data as of October 12, 2026).