520 Pike St
Temporarily unavailableEV charging station in Seattle, Washington on the ChargeLab network — 4 Level 2. US DOE AFDC station 455678.
At a glance
520 Pike St is a public EV charging station at 520 Pike St in Seattle, Washington, on the ChargeLab network. It has 4 charging ports (4 Level 2) with J1772 connectors. The US DOE registry lists it as temporarily unavailable, open since Mar 18, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 455678 |
| Network | ChargeLab |
| Status | Temporarily unavailable (T) |
| Access | Public |
| Open date | Mar 18, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 520 Pike St
- City
- Seattle
- State
- Washington
- ZIP
- 98108
- Coordinates
- 47.61132, -122.33505
Within ~15 km
Nearby charging
- 145th Shoreline MUR-70102 ports
OpConnect · Available
- Google52 ports
ChargePoint · Available
- City of Seattle - Muni Tower32 ports
Non-networked · Available
- Google24 ports
ChargePoint · Available
- Google24 ports
ChargePoint · Available
- Avenue 5 - Tesla Destination21 ports
Tesla Destination · Available
What kind of charging does 520 Pike St offer?
Of its 4 ports, 4 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 35% above the Washington average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does 520 Pike St compare with other stations in Seattle?
Seattle has 679 charging stations in the DOE registry with 1,890 ports, the most of 244 cities and towns in Washington. 520 Pike St accounts for under 1% of the charging ports in Seattle. ChargeLab runs 3 stations in Seattle. Statewide, Washington has 3,447 stations and 10,216 ports, the 6th-largest station count of the 51 states and DC. The biggest station in Washington, Pasco Wa Sdc in Pasco, has 144 ports.
Who operates 520 Pike St?
ChargeLab operates 406 stations in the registry across 38 states, with 325 DC fast and 1,312 Level 2 ports in total. 21 of those stations are in Washington, under 1% of the state's 3,447.
What does the “Temporarily unavailable” status mean?
“Temporarily unavailable” means the station exists but is reported as temporarily out of service. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 18, 2026, one of 657 stations in Washington with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does 520 Pike St have?
520 Pike St has 4 charging ports: 4 Level 2.
Does 520 Pike St have DC fast charging?
No. The registry lists no DC fast ports here; its 4 ports are all Level 2.
What connectors does 520 Pike St have?
520 Pike St has J1772 connectors.
Is 520 Pike St open to the public?
Yes. 520 Pike St is listed with public access, and its status is temporarily unavailable.
Where is 520 Pike St?
520 Pike St is at 520 Pike St, Seattle, WA 98108. Its coordinates are 47.61132, -122.33505.
More EV charging around Seattle
Working with Washington charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 455678, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “520 Pike St, Seattle, WA (AFDC station 455678)”, https://chargecensus.com/stations/washington/520-pike-st-455678 (data as of October 12, 2026).