1810 N Greene S Bldg 27
AvailableEV charging station in Spokane, Washington on the EV Connect network — 2 Level 2. US DOE AFDC station 250822.
At a glance
1810 N Greene S Bldg 27 is a public EV charging station at 1810 N Greene S in Spokane, Washington, on the EV Connect network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 18, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 250822 |
| Network | EV Connect |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 18, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1810 N Greene S
- City
- Spokane
- State
- Washington
- ZIP
- 99202
- Coordinates
- 47.67387, -117.35623
Within ~15 km
Nearby charging
- Wendle Motors13 ports
Synergev · Available
Blink · Available
Tesla Destination · Available
FLO · Available
- Women of Wisdom - WSU8 ports
OpConnect · Available
- 803 N Post St Parking8 ports
Non-networked · Available
What kind of charging does 1810 N Greene S Bldg 27 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 33% below the Washington average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does 1810 N Greene S Bldg 27 compare with other stations in Spokane?
Spokane has 140 charging stations in the DOE registry with 356 ports, the 3rd-most of 244 cities and towns in Washington. 1810 N Greene S Bldg 27 accounts for under 1% of the charging ports in Spokane. EV Connect runs 15 stations in Spokane. Statewide, Washington has 3,447 stations and 10,216 ports, the 6th-largest station count of the 51 states and DC. The biggest station in Washington, Pasco Wa Sdc in Pasco, has 144 ports.
Who operates 1810 N Greene S Bldg 27?
EV Connect operates 1,601 stations in the registry across 50 states, with 1,835 DC fast and 3,902 Level 2 ports in total. 94 of those stations are in Washington, 3% of the state's 3,447.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 18, 2023, one of 489 stations in Washington with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does 1810 N Greene S Bldg 27 have?
1810 N Greene S Bldg 27 has 2 charging ports: 2 Level 2.
Does 1810 N Greene S Bldg 27 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does 1810 N Greene S Bldg 27 have?
1810 N Greene S Bldg 27 has J1772 connectors.
Is 1810 N Greene S Bldg 27 open to the public?
Yes. 1810 N Greene S Bldg 27 is listed with public access, and its status is available.
Where is 1810 N Greene S Bldg 27?
1810 N Greene S Bldg 27 is at 1810 N Greene S, Spokane, WA 99202. Its coordinates are 47.67387, -117.35623.
More EV charging around Spokane
Working with Washington charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 250822, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “1810 N Greene S Bldg 27, Spokane, WA (AFDC station 250822)”, https://chargecensus.com/stations/washington/1810-n-greene-s-bldg-27-250822 (data as of October 12, 2026).