ChargeCensus

USP Lee

Available

EV charging station in Pennington Gap, Virginia, not on a charging network — 2 Level 1. US DOE AFDC station 184744.

At a glance

USP Lee is a private EV charging station at Lee County Industrial Park in Pennington Gap, Virginia, not attached to a charging network. It has 2 charging ports (2 Level 1) with NEMA 5-15 connectors. The US DOE registry lists it as available, open since Jan 15, 2021.

Total ports
2
DC fast
0
Level 2
0
Access
Private
workplace charging
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 2 nearby

Station record

DOE registry record

FieldValue
AFDC station ID184744
NetworkNon-networked
StatusAvailable (E)
AccessPrivate
FacilityFederal government
Open dateJan 15, 2021
Last updated at sourceFeb 2, 2026

Plugs

Connectors & pricing

  • NEMA 5-15 — Standard 120V wall outlet.

Pricing: not listed in the DOE registry.

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
Lee County Industrial Park
City
Pennington Gap
ZIP
24277
Coordinates
36.70300, -83.00163

Within ~15 km

Nearby charging

What kind of charging does USP Lee offer?

Of its 2 ports, 2 are Level 1. Level 1 ports are standard 120-volt outlets, the slowest way to charge. That is about 39% below the Virginia average of 3.3 ports per station. The registry lists one connector type: NEMA 5-15, Standard 120V wall outlet. The site is listed as a federal government location. It is flagged as workplace charging.

How does USP Lee compare with other stations in Pennington Gap?

Pennington Gap has 3 charging stations in the DOE registry with 6 ports. USP Lee accounts for 33% of the charging ports in Pennington Gap. Statewide, Virginia has 2,079 stations and 6,795 ports, the 13th-largest station count of the 51 states and DC. The biggest station in Virginia, Fort Lee in Fort Lee, has 118 ports.

Who operates USP Lee?

USP Lee is listed as non-networked: its chargers are not run through a charging-network account. Virginia has 369 non-networked stations, 18% of its total.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is private, meaning use is restricted, for example to a fleet, employees or residents. It opened on Jan 15, 2021, one of 236 stations in Virginia with a 2021 open date. The station's record was last updated at the source on Feb 2, 2026.

Frequently asked questions

How many chargers does USP Lee have?

USP Lee has 2 charging ports: 2 Level 1.

Does USP Lee have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 1.

What connectors does USP Lee have?

USP Lee has NEMA 5-15 connectors.

Is USP Lee open to the public?

No. USP Lee is listed with private access.

Where is USP Lee?

USP Lee is at Lee County Industrial Park, Pennington Gap, VA 24277. Its coordinates are 36.70300, -83.00163.

More EV charging around Pennington Gap

Working with Virginia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 184744, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “USP Lee, Pennington Gap, VA (AFDC station 184744)”, https://chargecensus.com/stations/virginia/usp-lee-184744 (data as of October 12, 2026).