ChargeCensus

Odu Odu 49th St

Available

EV charging station in Norfolk, Virginia on the ChargePoint network — 2 Level 2. US DOE AFDC station 458287.

At a glance

Odu Odu 49th St is a public EV charging station at 4904 Bluestone Ave in Norfolk, Virginia, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 28, 2026.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID458287
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateApr 28, 2026
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
4904 Bluestone Ave
ZIP
23508
Coordinates
36.88786, -76.30547

Within ~15 km

Nearby charging

What kind of charging does Odu Odu 49th St offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 39% below the Virginia average of 3.3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Odu Odu 49th St compare with other stations in Norfolk?

Norfolk has 54 charging stations in the DOE registry with 334 ports, the 9th-most of 228 cities and towns in Virginia. Odu Odu 49th St accounts for under 1% of the charging ports in Norfolk. ChargePoint runs 18 stations in Norfolk. Statewide, Virginia has 2,079 stations and 6,795 ports, the 13th-largest station count of the 51 states and DC. The biggest station in Virginia, Fort Lee in Fort Lee, has 118 ports.

Who operates Odu Odu 49th St?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 963 of those stations are in Virginia, 46% of the state's 2,079.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 28, 2026, one of 192 stations in Virginia with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Odu Odu 49th St have?

Odu Odu 49th St has 2 charging ports: 2 Level 2.

Does Odu Odu 49th St have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Odu Odu 49th St have?

Odu Odu 49th St has J1772 connectors.

Is Odu Odu 49th St open to the public?

Yes. Odu Odu 49th St is listed with public access, and its status is available.

Where is Odu Odu 49th St?

Odu Odu 49th St is at 4904 Bluestone Ave, Norfolk, VA 23508. Its coordinates are 36.88786, -76.30547.

More EV charging around Norfolk

Working with Virginia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 458287, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Odu Odu 49th St, Norfolk, VA (AFDC station 458287)”, https://chargecensus.com/stations/virginia/odu-odu-49th-st-458287 (data as of October 12, 2026).