New River Valley Mall
AvailableEV charging station in Christiansburg, Virginia on the EVgo network — 2 DC fast. US DOE AFDC station 228776.
At a glance
New River Valley Mall is a public EV charging station at 782 New River Rd in Christiansburg, Virginia, on the EVgo network. It has 2 charging ports (2 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Jun 23, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 228776 |
| Network | EVgo |
| Status | Available (E) |
| Access | Public |
| Open date | Jun 23, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 782 New River Rd
- City
- Christiansburg
- State
- Virginia
- ZIP
- 24073
- Coordinates
- 37.16529, -80.42615
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- The Quad Amenity Center8 ports
SWTCH · Available
Blink · Available
- First & Main Blacksburg4 ports
EVgo · Available
- Shelor Motor Mile4 ports
Ford Charge · Available
Tesla Destination · Available
What kind of charging does New River Valley Mall offer?
Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 39% below the Virginia average of 3.3 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.
How does New River Valley Mall compare with other stations in Christiansburg?
Christiansburg has 10 charging stations in the DOE registry with 22 ports. New River Valley Mall accounts for 9% of the charging ports in Christiansburg. It is the only EVgo station in Christiansburg. Statewide, Virginia has 2,079 stations and 6,795 ports, the 13th-largest station count of the 51 states and DC. The biggest station in Virginia, Fort Lee in Fort Lee, has 118 ports.
Who operates New River Valley Mall?
DC fast-focused urban charging network. EVgo operates 1,220 stations in the registry across 48 states, with 5,381 DC fast and 120 Level 2 ports in total. 62 of those stations are in Virginia, 3% of the state's 2,079.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 23, 2021, one of 236 stations in Virginia with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does New River Valley Mall have?
New River Valley Mall has 2 charging ports: 2 DC fast.
Does New River Valley Mall have DC fast charging?
Yes. The registry lists 2 DC fast ports at New River Valley Mall, with CHAdeMO and CCS connectors.
What connectors does New River Valley Mall have?
New River Valley Mall has CHAdeMO and CCS connectors.
Is New River Valley Mall open to the public?
Yes. New River Valley Mall is listed with public access, and its status is available.
Where is New River Valley Mall?
New River Valley Mall is at 782 New River Rd, Christiansburg, VA 24073. Its coordinates are 37.16529, -80.42615.
More EV charging around Christiansburg
Working with Virginia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 228776, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “New River Valley Mall, Christiansburg, VA (AFDC station 228776)”, https://chargecensus.com/stations/virginia/new-river-valley-mall-228776 (data as of October 12, 2026).