Loudoun County Gov Ctr 1
AvailableEV charging station in Leesburg, Virginia on the ChargePoint network — 2 Level 2. US DOE AFDC station 450961.
At a glance
Loudoun County Gov Ctr 1 is a public EV charging station at 1 Harrison Street Southeast in Leesburg, Virginia, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 10, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 450961 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Feb 10, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
Within ~15 km
Nearby charging
Electrify America · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- Aventon Moorefield12 ports
Blink · Available
- Verizon - Ashburn12 ports
Non-networked · Available
- Google10 ports
ChargePoint · Available
What kind of charging does Loudoun County Gov Ctr 1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 39% below the Virginia average of 3.3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Loudoun County Gov Ctr 1 compare with other stations in Leesburg?
Leesburg has 31 charging stations in the DOE registry with 93 ports, the 20th-most of 228 cities and towns in Virginia. Loudoun County Gov Ctr 1 accounts for 2% of the charging ports in Leesburg. ChargePoint runs 23 stations in Leesburg. Statewide, Virginia has 2,079 stations and 6,795 ports, the 13th-largest station count of the 51 states and DC. The biggest station in Virginia, Fort Lee in Fort Lee, has 118 ports.
Who operates Loudoun County Gov Ctr 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 963 of those stations are in Virginia, 46% of the state's 2,079.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 10, 2026, one of 192 stations in Virginia with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Loudoun County Gov Ctr 1 have?
Loudoun County Gov Ctr 1 has 2 charging ports: 2 Level 2.
Does Loudoun County Gov Ctr 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Loudoun County Gov Ctr 1 have?
Loudoun County Gov Ctr 1 has J1772 connectors.
Is Loudoun County Gov Ctr 1 open to the public?
Yes. Loudoun County Gov Ctr 1 is listed with public access, and its status is available.
Where is Loudoun County Gov Ctr 1?
Loudoun County Gov Ctr 1 is at 1 Harrison Street Southeast, Leesburg, VA 20175. Its coordinates are 39.11408, -77.56337.
More EV charging around Leesburg
Working with Virginia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 450961, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Loudoun County Gov Ctr 1, Leesburg, VA (AFDC station 450961)”, https://chargecensus.com/stations/virginia/loudoun-county-gov-ctr-1-450961 (data as of October 12, 2026).