L379 Bmw Station 2
AvailableEV charging station in Sterling, Virginia on the ChargePoint network — 1 DC fast. US DOE AFDC station 235658.
At a glance
L379 Bmw Station 2 is a public EV charging station at 21710 Auto World Cir in Sterling, Virginia, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Nov 4, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 235658 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Nov 4, 2022 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
Electrify America · Available
- Dulles Airport14 ports
OpConnect · Available
- Electrify America HQ13 ports
EV Connect · Available
- Aventon Moorefield12 ports
Blink · Available
- Electrify America Reston Site12 ports
Blink · Available
Tesla Supercharger · Available
What kind of charging does L379 Bmw Station 2 offer?
Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 69% below the Virginia average of 3.3 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.
How does L379 Bmw Station 2 compare with other stations in Sterling?
Sterling has 74 charging stations in the DOE registry with 169 ports, the 4th-most of 228 cities and towns in Virginia. L379 Bmw Station 2 accounts for under 1% of the charging ports in Sterling. ChargePoint runs 57 stations in Sterling. Statewide, Virginia has 2,079 stations and 6,795 ports, the 13th-largest station count of the 51 states and DC. The biggest station in Virginia, Fort Lee in Fort Lee, has 118 ports.
Who operates L379 Bmw Station 2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 963 of those stations are in Virginia, 46% of the state's 2,079.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 4, 2022, one of 194 stations in Virginia with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does L379 Bmw Station 2 have?
L379 Bmw Station 2 has 1 charging port: 1 DC fast.
Does L379 Bmw Station 2 have DC fast charging?
Yes. The registry lists 1 DC fast port at L379 Bmw Station 2, with CHAdeMO and CCS connectors.
What connectors does L379 Bmw Station 2 have?
L379 Bmw Station 2 has CHAdeMO and CCS connectors.
Is L379 Bmw Station 2 open to the public?
Yes. L379 Bmw Station 2 is listed with public access, and its status is available.
Where is L379 Bmw Station 2?
L379 Bmw Station 2 is at 21710 Auto World Cir, Sterling, VA 20166. Its coordinates are 39.01222, -77.44026.
More EV charging around Sterling
Working with Virginia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 235658, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “L379 Bmw Station 2, Sterling, VA (AFDC station 235658)”, https://chargecensus.com/stations/virginia/l379-bmw-station-2-235658 (data as of October 12, 2026).