ChargeCensus

L379 Bmw 4

Available

EV charging station in Sterling, Virginia on the ChargePoint network — 1 DC fast. US DOE AFDC station 235910.

At a glance

L379 Bmw 4 is a public EV charging station at 21710 Auto World Cir in Sterling, Virginia, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Nov 10, 2022.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID235910
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateNov 10, 2022
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
21710 Auto World Cir
ZIP
20166
Coordinates
39.01210, -77.43996

Within ~15 km

Nearby charging

What kind of charging does L379 Bmw 4 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 69% below the Virginia average of 3.3 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does L379 Bmw 4 compare with other stations in Sterling?

Sterling has 74 charging stations in the DOE registry with 169 ports, the 4th-most of 228 cities and towns in Virginia. L379 Bmw 4 accounts for under 1% of the charging ports in Sterling. ChargePoint runs 57 stations in Sterling. Statewide, Virginia has 2,079 stations and 6,795 ports, the 13th-largest station count of the 51 states and DC. The biggest station in Virginia, Fort Lee in Fort Lee, has 118 ports.

Who operates L379 Bmw 4?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 963 of those stations are in Virginia, 46% of the state's 2,079.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 10, 2022, one of 194 stations in Virginia with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does L379 Bmw 4 have?

L379 Bmw 4 has 1 charging port: 1 DC fast.

Does L379 Bmw 4 have DC fast charging?

Yes. The registry lists 1 DC fast port at L379 Bmw 4, with CHAdeMO and CCS connectors.

What connectors does L379 Bmw 4 have?

L379 Bmw 4 has CHAdeMO and CCS connectors.

Is L379 Bmw 4 open to the public?

Yes. L379 Bmw 4 is listed with public access, and its status is available.

Where is L379 Bmw 4?

L379 Bmw 4 is at 21710 Auto World Cir, Sterling, VA 20166. Its coordinates are 39.01210, -77.43996.

More EV charging around Sterling

Working with Virginia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 235910, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “L379 Bmw 4, Sterling, VA (AFDC station 235910)”, https://chargecensus.com/stations/virginia/l379-bmw-4-235910 (data as of October 12, 2026).