Inova Oakville Chargepoint2
AvailableEV charging station in Alexandria, Virginia on the ChargePoint network — 2 Level 2. US DOE AFDC station 361793.
At a glance
Inova Oakville Chargepoint2 is a public EV charging station at 400 Fannon St in Alexandria, Virginia, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 6, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 361793 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Nov 6, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 400 Fannon St
- City
- Alexandria
- State
- Virginia
- ZIP
- 22301
- Coordinates
- 38.82800, -77.05182
Within ~15 km
Nearby charging
Non-networked · Available
Tesla Destination · Available
- Rosslyn Towers24 ports
Loop · Available
- DOE Forrestal24 ports
Non-networked · Available
- Fort Belvoir22 ports
Non-networked · Available
- Usgbf Tsa, Llc.20 ports
Blink · Available
What kind of charging does Inova Oakville Chargepoint2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 39% below the Virginia average of 3.3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Inova Oakville Chargepoint2 compare with other stations in Alexandria?
Alexandria has 91 charging stations in the DOE registry with 267 ports, the 3rd-most of 228 cities and towns in Virginia. Inova Oakville Chargepoint2 accounts for under 1% of the charging ports in Alexandria. ChargePoint runs 41 stations in Alexandria. Statewide, Virginia has 2,079 stations and 6,795 ports, the 13th-largest station count of the 51 states and DC. The biggest station in Virginia, Fort Lee in Fort Lee, has 118 ports.
Who operates Inova Oakville Chargepoint2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 963 of those stations are in Virginia, 46% of the state's 2,079.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 6, 2024, one of 325 stations in Virginia with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Inova Oakville Chargepoint2 have?
Inova Oakville Chargepoint2 has 2 charging ports: 2 Level 2.
Does Inova Oakville Chargepoint2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Inova Oakville Chargepoint2 have?
Inova Oakville Chargepoint2 has J1772 connectors.
Is Inova Oakville Chargepoint2 open to the public?
Yes. Inova Oakville Chargepoint2 is listed with public access, and its status is available.
Where is Inova Oakville Chargepoint2?
Inova Oakville Chargepoint2 is at 400 Fannon St, Alexandria, VA 22301. Its coordinates are 38.82800, -77.05182.
More EV charging around Alexandria
Working with Virginia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 361793, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Inova Oakville Chargepoint2, Alexandria, VA (AFDC station 361793)”, https://chargecensus.com/stations/virginia/inova-oakville-chargepoint2-361793 (data as of October 12, 2026).