ChargeCensus

Hart Nissan

Available

EV charging station in Mechanicsville, Virginia on the Blink network — 2 Level 2. US DOE AFDC station 47561.

At a glance

Hart Nissan is a public EV charging station at 6564 Mechanicsville Pike in Mechanicsville, Virginia, on the Blink network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 21, 2017.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID47561
NetworkBlink
StatusAvailable (E)
AccessPublic
FacilityCar dealership
Open dateFeb 21, 2017
Last updated at sourceFeb 2, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: Free

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
6564 Mechanicsville Pike
ZIP
23111
Coordinates
37.61328, -77.33585

Within ~15 km

Nearby charging

What kind of charging does Hart Nissan offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 39% below the Virginia average of 3.3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a car dealership location.

How does Hart Nissan compare with other stations in Mechanicsville?

Mechanicsville has 16 charging stations in the DOE registry with 40 ports. Hart Nissan accounts for 5% of the charging ports in Mechanicsville. Blink runs 2 stations in Mechanicsville. Statewide, Virginia has 2,079 stations and 6,795 ports, the 13th-largest station count of the 51 states and DC. The biggest station in Virginia, Fort Lee in Fort Lee, has 118 ports.

Who operates Hart Nissan?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 224 of those stations are in Virginia, 11% of the state's 2,079.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 21, 2017, one of 56 stations in Virginia with a 2017 open date. The station's record was last updated at the source on Feb 2, 2026.

Frequently asked questions

How many chargers does Hart Nissan have?

Hart Nissan has 2 charging ports: 2 Level 2.

Does Hart Nissan have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Hart Nissan have?

Hart Nissan has J1772 connectors.

Is charging at Hart Nissan free?

Pricing as reported to the DOE registry: Free.

Is Hart Nissan open to the public?

Yes. Hart Nissan is listed with public access, and its status is available.

Where is Hart Nissan?

Hart Nissan is at 6564 Mechanicsville Pike, Mechanicsville, VA 23111. Its coordinates are 37.61328, -77.33585.

More EV charging around Mechanicsville

Working with Virginia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 47561, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Hart Nissan, Mechanicsville, VA (AFDC station 47561)”, https://chargecensus.com/stations/virginia/hart-nissan-47561 (data as of October 12, 2026).