Dev Public Lgbg Lot A #1
AvailableEV charging station in Henrico, Virginia on the ChargePoint network — 2 Level 2. US DOE AFDC station 334368.
At a glance
Dev Public Lgbg Lot A #1 is a public EV charging station at 1800 Lakeside Avenue in Henrico, Virginia, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 2, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 334368 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | May 2, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1800 Lakeside Avenue
- City
- Henrico
- State
- Virginia
- ZIP
- 23228
- Coordinates
- 37.62039, -77.47013
Within ~15 km
Nearby charging
- CoStar22 ports
Loop · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- The Waterford12 ports
AmpUp · Available
Tesla Supercharger · Available
- TA Lewistown Road, Ashland, VA12 ports
bp pulse · Available
What kind of charging does Dev Public Lgbg Lot A #1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 39% below the Virginia average of 3.3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Dev Public Lgbg Lot A #1 compare with other stations in Henrico?
Henrico has 9 charging stations in the DOE registry with 22 ports. Dev Public Lgbg Lot A #1 accounts for 9% of the charging ports in Henrico. ChargePoint runs 5 stations in Henrico. Statewide, Virginia has 2,079 stations and 6,795 ports, the 13th-largest station count of the 51 states and DC. The biggest station in Virginia, Fort Lee in Fort Lee, has 118 ports.
Who operates Dev Public Lgbg Lot A #1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 963 of those stations are in Virginia, 46% of the state's 2,079.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 2, 2024, one of 325 stations in Virginia with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Dev Public Lgbg Lot A #1 have?
Dev Public Lgbg Lot A #1 has 2 charging ports: 2 Level 2.
Does Dev Public Lgbg Lot A #1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Dev Public Lgbg Lot A #1 have?
Dev Public Lgbg Lot A #1 has J1772 connectors.
Is Dev Public Lgbg Lot A #1 open to the public?
Yes. Dev Public Lgbg Lot A #1 is listed with public access, and its status is available.
Where is Dev Public Lgbg Lot A #1?
Dev Public Lgbg Lot A #1 is at 1800 Lakeside Avenue, Henrico, VA 23228. Its coordinates are 37.62039, -77.47013.
More EV charging around Henrico
Working with Virginia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 334368, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Dev Public Lgbg Lot A #1, Henrico, VA (AFDC station 334368)”, https://chargecensus.com/stations/virginia/dev-public-lgbg-lot-a-1-334368 (data as of October 12, 2026).