Dev Evsp Iad 1u #3
AvailableEV charging station in Sterling, Virginia on the ChargePoint network — 2 Level 2. US DOE AFDC station 330615.
At a glance
Dev Evsp Iad 1u #3 is a public EV charging station at 9300 Cargo Dr in Sterling, Virginia, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 15, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 330615 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Mar 15, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
Electrify America · Available
- Dulles Airport14 ports
OpConnect · Available
- Electrify America HQ13 ports
EV Connect · Available
- Electrify America Reston Site12 ports
Blink · Available
- Fairfax, VA - Tesla Supercharger12 ports
Tesla Supercharger · Available
Tesla Supercharger · Available
What kind of charging does Dev Evsp Iad 1u #3 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 39% below the Virginia average of 3.3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Dev Evsp Iad 1u #3 compare with other stations in Sterling?
Sterling has 74 charging stations in the DOE registry with 169 ports, the 4th-most of 228 cities and towns in Virginia. Dev Evsp Iad 1u #3 accounts for 1% of the charging ports in Sterling. ChargePoint runs 57 stations in Sterling. Statewide, Virginia has 2,079 stations and 6,795 ports, the 13th-largest station count of the 51 states and DC. The biggest station in Virginia, Fort Lee in Fort Lee, has 118 ports.
Who operates Dev Evsp Iad 1u #3?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 963 of those stations are in Virginia, 46% of the state's 2,079.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 15, 2024, one of 325 stations in Virginia with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Dev Evsp Iad 1u #3 have?
Dev Evsp Iad 1u #3 has 2 charging ports: 2 Level 2.
Does Dev Evsp Iad 1u #3 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Dev Evsp Iad 1u #3 have?
Dev Evsp Iad 1u #3 has J1772 connectors.
Is Dev Evsp Iad 1u #3 open to the public?
Yes. Dev Evsp Iad 1u #3 is listed with public access, and its status is available.
Where is Dev Evsp Iad 1u #3?
Dev Evsp Iad 1u #3 is at 9300 Cargo Dr, Sterling, VA 20166. Its coordinates are 38.95542, -77.45246.
More EV charging around Sterling
Working with Virginia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 330615, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Dev Evsp Iad 1u #3, Sterling, VA (AFDC station 330615)”, https://chargecensus.com/stations/virginia/dev-evsp-iad-1u-3-330615 (data as of October 12, 2026).