ChargeCensus

Dante Depot

Planned

EV charging station in Dante, Virginia on the OpConnect network — 1 Level 2. US DOE AFDC station 428595.

At a glance

Dante Depot is a public EV charging station at 506 Bunchtown Rd in Dante, Virginia, on the OpConnect network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as planned, with a listed open date of Oct 2, 2025.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 1 nearby

Station record

DOE registry record

FieldValue
AFDC station ID428595
NetworkOpConnect
StatusPlanned (P)
AccessPublic
Open dateOct 2, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

OpConnect

Operates 526 stations in the DOE registry — view the full network →

Location

Address
506 Bunchtown Rd
City
Dante
ZIP
24237
Coordinates
36.97765, -82.29773

Within ~15 km

Nearby charging

What kind of charging does Dante Depot offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 69% below the Virginia average of 3.3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Dante Depot compare with other stations in Dante?

Dante has 1 charging station in the DOE registry with 1 ports. It is the only OpConnect station in Dante. Statewide, Virginia has 2,079 stations and 6,795 ports, the 13th-largest station count of the 51 states and DC. The biggest station in Virginia, Fort Lee in Fort Lee, has 118 ports.

Who operates Dante Depot?

OpConnect operates 526 stations in the registry across 31 states, with 173 DC fast and 1,887 Level 2 ports in total. 11 of those stations are in Virginia, under 1% of the state's 2,079.

What does the “Planned” status mean?

“Planned” means the station has been reported to the registry as planned and is not yet open. Its access code is public, meaning it is listed as open to any driver. Its listed open date is Oct 2, 2025, one of 326 stations in Virginia with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Dante Depot have?

Dante Depot has 1 charging port: 1 Level 2.

Does Dante Depot have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does Dante Depot have?

Dante Depot has J1772 connectors.

Is Dante Depot open to the public?

Yes. Dante Depot is listed with public access, and its status is planned.

Where is Dante Depot?

Dante Depot is at 506 Bunchtown Rd, Dante, VA 24237. Its coordinates are 36.97765, -82.29773.

More EV charging around Dante

Working with Virginia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 428595, weekly full pull.