ChargeCensus

Acc7 Acc7 (02)

Available

EV charging station in Ashburn, Virginia on the ChargePoint network — 2 Level 2. US DOE AFDC station 319895.

At a glance

Acc7 Acc7 (02) is a public EV charging station at 21625 Gresham Dr in Ashburn, Virginia, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 16, 2023.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID319895
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateNov 16, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
21625 Gresham Dr
ZIP
20147
Coordinates
39.01766, -77.46528

Within ~15 km

Nearby charging

What kind of charging does Acc7 Acc7 (02) offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 39% below the Virginia average of 3.3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Acc7 Acc7 (02) compare with other stations in Ashburn?

Ashburn has 57 charging stations in the DOE registry with 207 ports, the 8th-most of 228 cities and towns in Virginia. Acc7 Acc7 (02) accounts for under 1% of the charging ports in Ashburn. ChargePoint runs 49 stations in Ashburn. Statewide, Virginia has 2,079 stations and 6,795 ports, the 13th-largest station count of the 51 states and DC. The biggest station in Virginia, Fort Lee in Fort Lee, has 118 ports.

Who operates Acc7 Acc7 (02)?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 963 of those stations are in Virginia, 46% of the state's 2,079.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 16, 2023, one of 297 stations in Virginia with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Acc7 Acc7 (02) have?

Acc7 Acc7 (02) has 2 charging ports: 2 Level 2.

Does Acc7 Acc7 (02) have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Acc7 Acc7 (02) have?

Acc7 Acc7 (02) has J1772 connectors.

Is Acc7 Acc7 (02) open to the public?

Yes. Acc7 Acc7 (02) is listed with public access, and its status is available.

Where is Acc7 Acc7 (02)?

Acc7 Acc7 (02) is at 21625 Gresham Dr, Ashburn, VA 20147. Its coordinates are 39.01766, -77.46528.

More EV charging around Ashburn

Working with Virginia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 319895, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Acc7 Acc7 (02), Ashburn, VA (AFDC station 319895)”, https://chargecensus.com/stations/virginia/acc7-acc7-02-319895 (data as of October 12, 2026).