ChargeCensus

Woodstock Inn 1

Available

EV charging station in Woodstock, Vermont on the ChargePoint network — 2 Level 2. US DOE AFDC station 360832.

At a glance

Woodstock Inn 1 is a public EV charging station at 9 Cross Street in Woodstock, Vermont, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 26, 2024.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID360832
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateOct 26, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
9 Cross Street
City
Woodstock
State
Vermont
ZIP
05091
Coordinates
43.62186, -72.51728

Within ~15 km

Nearby charging

What kind of charging does Woodstock Inn 1 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 21% below the Vermont average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Woodstock Inn 1 compare with other stations in Woodstock?

Woodstock has 7 charging stations in the DOE registry with 17 ports, the 21st-most of 122 cities and towns in Vermont. Woodstock Inn 1 accounts for 12% of the charging ports in Woodstock. ChargePoint runs 2 stations in Woodstock. Statewide, Vermont has 581 stations and 1,476 ports, the 31st-largest station count of the 51 states and DC. The biggest station in Vermont, OnLogic in South Burlington, has 24 ports.

Who operates Woodstock Inn 1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 298 of those stations are in Vermont, 51% of the state's 581.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 26, 2024, one of 91 stations in Vermont with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Woodstock Inn 1 have?

Woodstock Inn 1 has 2 charging ports: 2 Level 2.

Does Woodstock Inn 1 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Woodstock Inn 1 have?

Woodstock Inn 1 has J1772 connectors.

Is Woodstock Inn 1 open to the public?

Yes. Woodstock Inn 1 is listed with public access, and its status is available.

Where is Woodstock Inn 1?

Woodstock Inn 1 is at 9 Cross Street, Woodstock, VT 05091. Its coordinates are 43.62186, -72.51728.

More EV charging around Woodstock

Working with Vermont charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 360832, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Woodstock Inn 1, Woodstock, VT (AFDC station 360832)”, https://chargecensus.com/stations/vermont/woodstock-inn-1-360832 (data as of October 12, 2026).