Vermont Public Station 2
AvailableEV charging station in Colchester, Vermont on the ChargePoint network — 1 Level 2. US DOE AFDC station 405324.
At a glance
Vermont Public Station 2 is a public EV charging station at 365 Troy Ave in Colchester, Vermont, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 3, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 405324 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jul 3, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 365 Troy Ave
- City
- Colchester
- State
- Vermont
- ZIP
- 05446
- Coordinates
- 44.50808, -73.15050
Within ~15 km
Nearby charging
- OnLogic24 ports
ViaLynk · Available
- Green Mountain Power19 ports
Non-networked · Available
Tesla Destination · Available
Non-networked · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
What kind of charging does Vermont Public Station 2 offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 61% below the Vermont average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Vermont Public Station 2 compare with other stations in Colchester?
Colchester has 12 charging stations in the DOE registry with 41 ports, the 9th-most of 122 cities and towns in Vermont. Vermont Public Station 2 accounts for 2% of the charging ports in Colchester. ChargePoint runs 5 stations in Colchester. Statewide, Vermont has 581 stations and 1,476 ports, the 31st-largest station count of the 51 states and DC. The biggest station in Vermont, OnLogic in South Burlington, has 24 ports.
Who operates Vermont Public Station 2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 298 of those stations are in Vermont, 51% of the state's 581.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 3, 2025, one of 110 stations in Vermont with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Vermont Public Station 2 have?
Vermont Public Station 2 has 1 charging port: 1 Level 2.
Does Vermont Public Station 2 have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Vermont Public Station 2 have?
Vermont Public Station 2 has J1772 connectors.
Is Vermont Public Station 2 open to the public?
Yes. Vermont Public Station 2 is listed with public access, and its status is available.
Where is Vermont Public Station 2?
Vermont Public Station 2 is at 365 Troy Ave, Colchester, VT 05446. Its coordinates are 44.50808, -73.15050.
More EV charging around Colchester
Working with Vermont charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 405324, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Vermont Public Station 2, Colchester, VT (AFDC station 405324)”, https://chargecensus.com/stations/vermont/vermont-public-station-2-405324 (data as of October 12, 2026).