Vermont Bgs Spring Fw Evse1
AvailableEV charging station in Springfield, Vermont on the ChargePoint network — 2 Level 2. US DOE AFDC station 230744.
At a glance
Vermont Bgs Spring Fw Evse1 is a public EV charging station at 100 Mineral St in Springfield, Vermont, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 30, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 230744 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Sep 30, 2022 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 100 Mineral St
- City
- Springfield
- State
- Vermont
- ZIP
- 05156
- Coordinates
- 43.29822, -72.48412
Within ~15 km
Nearby charging
- Irving Oil6 ports
Blink · Available
- The Barn Cafe3 ports
Blink · Available
- Arena Games Tier 22 ports
ZEF Energy · Available
- Toc Cobleigh Field2 ports
ChargePoint · Available
- Toc Town Of Chester2 ports
ChargePoint · Available
- The Grafton Inn2 ports
Blink · Available
What kind of charging does Vermont Bgs Spring Fw Evse1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 21% below the Vermont average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Vermont Bgs Spring Fw Evse1 compare with other stations in Springfield?
Springfield has 4 charging stations in the DOE registry with 11 ports. Vermont Bgs Spring Fw Evse1 accounts for 18% of the charging ports in Springfield. It is the only ChargePoint station in Springfield. Statewide, Vermont has 581 stations and 1,476 ports, the 31st-largest station count of the 51 states and DC. The biggest station in Vermont, OnLogic in South Burlington, has 24 ports.
Who operates Vermont Bgs Spring Fw Evse1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 298 of those stations are in Vermont, 51% of the state's 581.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 30, 2022, one of 58 stations in Vermont with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Vermont Bgs Spring Fw Evse1 have?
Vermont Bgs Spring Fw Evse1 has 2 charging ports: 2 Level 2.
Does Vermont Bgs Spring Fw Evse1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Vermont Bgs Spring Fw Evse1 have?
Vermont Bgs Spring Fw Evse1 has J1772 connectors.
Is Vermont Bgs Spring Fw Evse1 open to the public?
Yes. Vermont Bgs Spring Fw Evse1 is listed with public access, and its status is available.
Where is Vermont Bgs Spring Fw Evse1?
Vermont Bgs Spring Fw Evse1 is at 100 Mineral St, Springfield, VT 05156. Its coordinates are 43.29822, -72.48412.
More EV charging around Springfield
Working with Vermont charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 230744, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Vermont Bgs Spring Fw Evse1, Springfield, VT (AFDC station 230744)”, https://chargecensus.com/stations/vermont/vermont-bgs-spring-fw-evse1-230744 (data as of October 12, 2026).