ChargeCensus

Uvm Firestone 2

Available

EV charging station in Burlington, Vermont on the ChargePoint network — 2 Level 2. US DOE AFDC station 226637.

At a glance

Uvm Firestone 2 is a public EV charging station at 149 Beaumont Ave in Burlington, Vermont, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 27, 2022.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID226637
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateAug 27, 2022
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
149 Beaumont Ave
State
Vermont
ZIP
05405
Coordinates
44.47712, -73.19303

Within ~15 km

Nearby charging

What kind of charging does Uvm Firestone 2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 21% below the Vermont average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Uvm Firestone 2 compare with other stations in Burlington?

Burlington has 104 charging stations in the DOE registry with 184 ports, the most of 122 cities and towns in Vermont. Uvm Firestone 2 accounts for 1% of the charging ports in Burlington. ChargePoint runs 87 stations in Burlington. Statewide, Vermont has 581 stations and 1,476 ports, the 31st-largest station count of the 51 states and DC. The biggest station in Vermont, OnLogic in South Burlington, has 24 ports.

Who operates Uvm Firestone 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 298 of those stations are in Vermont, 51% of the state's 581.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 27, 2022, one of 58 stations in Vermont with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Uvm Firestone 2 have?

Uvm Firestone 2 has 2 charging ports: 2 Level 2.

Does Uvm Firestone 2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Uvm Firestone 2 have?

Uvm Firestone 2 has J1772 connectors.

Is Uvm Firestone 2 open to the public?

Yes. Uvm Firestone 2 is listed with public access, and its status is available.

Where is Uvm Firestone 2?

Uvm Firestone 2 is at 149 Beaumont Ave, Burlington, VT 05405. Its coordinates are 44.47712, -73.19303.

More EV charging around Burlington

Working with Vermont charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 226637, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Uvm Firestone 2, Burlington, VT (AFDC station 226637)”, https://chargecensus.com/stations/vermont/uvm-firestone-2-226637 (data as of October 12, 2026).