Sugarbush Resort - Mt Ellen ADA
AvailableEV charging station in Fayston, Vermont, not on a charging network — 1 Level 2. US DOE AFDC station 150333.
At a glance
Sugarbush Resort - Mt Ellen ADA is a public EV charging station at 626 Mount Ellen Rd in Fayston, Vermont, not attached to a charging network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 15, 2019.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 150333 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Rec Sports Facility |
| Open date | Dec 15, 2019 |
| Last updated at source | Jul 15, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: Free
Location
- Address
- 626 Mount Ellen Rd
- City
- Fayston
- State
- Vermont
- ZIP
- 05673
- Coordinates
- 44.17747, -72.90159
Within ~15 km
Nearby charging
Tesla Destination · Available
Tesla Destination · Available
- Bridges Resort Site6 ports
Noodoe · Available
- Town Of Warren School House2 ports
ChargePoint · Available
- Town Of Warren Town Parking2 ports
ChargePoint · Available
- Irasville Country Store2 ports
ViaLynk · Available
What kind of charging does Sugarbush Resort - Mt Ellen ADA offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 61% below the Vermont average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a rec sports facility location.
How does Sugarbush Resort - Mt Ellen ADA compare with other stations in Fayston?
Fayston has 1 charging station in the DOE registry with 1 ports. Statewide, Vermont has 581 stations and 1,476 ports, the 31st-largest station count of the 51 states and DC. The biggest station in Vermont, OnLogic in South Burlington, has 24 ports.
Who operates Sugarbush Resort - Mt Ellen ADA?
Sugarbush Resort - Mt Ellen ADA is listed as non-networked: its chargers are not run through a charging-network account. Vermont has 67 non-networked stations, 12% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 15, 2019, one of 25 stations in Vermont with a 2019 open date. The station's record was last updated at the source on Jul 15, 2026.
Frequently asked questions
How many chargers does Sugarbush Resort - Mt Ellen ADA have?
Sugarbush Resort - Mt Ellen ADA has 1 charging port: 1 Level 2.
Does Sugarbush Resort - Mt Ellen ADA have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Sugarbush Resort - Mt Ellen ADA have?
Sugarbush Resort - Mt Ellen ADA has J1772 connectors.
Is charging at Sugarbush Resort - Mt Ellen ADA free?
Pricing as reported to the DOE registry: Free.
Is Sugarbush Resort - Mt Ellen ADA open to the public?
Yes. Sugarbush Resort - Mt Ellen ADA is listed with public access, and its status is available.
Where is Sugarbush Resort - Mt Ellen ADA?
Sugarbush Resort - Mt Ellen ADA is at 626 Mount Ellen Rd, Fayston, VT 05673. Its coordinates are 44.17747, -72.90159.
More EV charging around Fayston
Working with Vermont charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 150333, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Sugarbush Resort - Mt Ellen ADA, Fayston, VT (AFDC station 150333)”, https://chargecensus.com/stations/vermont/sugarbush-resort-mt-ellen-ada-150333 (data as of October 12, 2026).