Stowe Mountain Resort
AvailableEV charging station in Stowe, Vermont on the AmpUp network — 2 Level 2. US DOE AFDC station 335299.
At a glance
Stowe Mountain Resort is a public EV charging station at 5402 Mountain Rd in Stowe, Vermont, on the AmpUp network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 6, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 335299 |
| Network | AmpUp |
| Status | Available (E) |
| Access | Public |
| Facility | Rec Sports Facility |
| Open date | Nov 6, 2023 |
| Last updated at source | Oct 2, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: $0.25 per kWh
Within ~15 km
Nearby charging
- Johnson Jolley6 ports
Blink · Available
- Johnson Town Office4 ports
Non-networked · Available
Tesla Destination · Available
ChargePoint · Temporarily unavailable
- Stowe Electric Green Mt Inn2 ports
ChargePoint · Available
- Stowe Electric Memorial Park2 ports
ChargePoint · Available
What kind of charging does Stowe Mountain Resort offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 21% below the Vermont average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$0.25 per kWh”. The site is listed as a rec sports facility location.
How does Stowe Mountain Resort compare with other stations in Stowe?
Stowe has 19 charging stations in the DOE registry with 33 ports, the 4th-most of 122 cities and towns in Vermont. Stowe Mountain Resort accounts for 6% of the charging ports in Stowe. AmpUp runs 2 stations in Stowe. Statewide, Vermont has 581 stations and 1,476 ports, the 31st-largest station count of the 51 states and DC. The biggest station in Vermont, OnLogic in South Burlington, has 24 ports.
Who operates Stowe Mountain Resort?
AmpUp operates 1,322 stations in the registry across 47 states, with 18 DC fast and 5,339 Level 2 ports in total. 23 of those stations are in Vermont, 4% of the state's 581.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 6, 2023, one of 52 stations in Vermont with a 2023 open date. The station's record was last updated at the source on Oct 2, 2026.
Frequently asked questions
How many chargers does Stowe Mountain Resort have?
Stowe Mountain Resort has 2 charging ports: 2 Level 2.
Does Stowe Mountain Resort have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Stowe Mountain Resort have?
Stowe Mountain Resort has J1772 connectors.
Is charging at Stowe Mountain Resort free?
Pricing as reported to the DOE registry: $0.25 per kWh.
Is Stowe Mountain Resort open to the public?
Yes. Stowe Mountain Resort is listed with public access, and its status is available.
Where is Stowe Mountain Resort?
Stowe Mountain Resort is at 5402 Mountain Rd, Stowe, VT 05672. Its coordinates are 44.50640, -72.76131.
More EV charging around Stowe
Working with Vermont charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 335299, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Stowe Mountain Resort, Stowe, VT (AFDC station 335299)”, https://chargecensus.com/stations/vermont/stowe-mountain-resort-335299 (data as of October 12, 2026).