AvailableEV charging station in Middlebury, Vermont on the Blink network — 2 DC fast · 2 Level 2. US DOE AFDC station 422115.
At a glance
Stone CDJR is a public EV charging station at 2149 US Route 7 south in Middlebury, Vermont, on the Blink network. It has 4 charging ports (2 DC fast · 2 Level 2) with J1772 and CCS connectors. The US DOE registry lists it as available, open since Sep 11, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 422115 |
| Network | Blink |
| Status | Available (E) |
| Access | Public |
| Open date | Sep 11, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 2149 US Route 7 south
- City
- Middlebury
- State
- Vermont
- ZIP
- 05753
- Coordinates
- 43.98970, -73.13828
Within ~15 km
Nearby charging
- Meeker House6 ports
Blink · Available
- GMP Middlebury4 ports
ViaLynk · Available
- Gmphome Middlebury 32 ports
ChargePoint · Available
- Porter Medical Center2 ports
Blink · Available
- Pahcc2 ports
AmpUp · Available
- Gmphome Middlebury 22 ports
ChargePoint · Available
What kind of charging does Stone CDJR offer?
Of its 4 ports, 2 are DC fast and 2 are Level 2. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 57% above the Vermont average of 2.5 ports per station. The registry lists 2 connector types: J1772, the standard Level 1/2 AC connector; CCS, Combined Charging System — the J1772-based DC fast connector.
How does Stone CDJR compare with other stations in Middlebury?
Middlebury has 18 charging stations in the DOE registry with 42 ports, the 5th-most of 122 cities and towns in Vermont. Stone CDJR accounts for 10% of the charging ports in Middlebury. Blink runs 6 stations in Middlebury. Statewide, Vermont has 581 stations and 1,476 ports, the 31st-largest station count of the 51 states and DC. The biggest station in Vermont, OnLogic in South Burlington, has 24 ports.
Who operates Stone CDJR?
Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 52 of those stations are in Vermont, 9% of the state's 581.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 11, 2025, one of 110 stations in Vermont with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Stone CDJR have?
Stone CDJR has 4 charging ports: 2 DC fast · 2 Level 2.
Does Stone CDJR have DC fast charging?
Yes. The registry lists 2 DC fast ports at Stone CDJR, with CCS connectors.
What connectors does Stone CDJR have?
Stone CDJR has J1772 and CCS connectors.
Is Stone CDJR open to the public?
Yes. Stone CDJR is listed with public access, and its status is available.
Where is Stone CDJR?
Stone CDJR is at 2149 US Route 7 south, Middlebury, VT 05753. Its coordinates are 43.98970, -73.13828.
More EV charging around Middlebury
Working with Vermont charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 422115, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Stone CDJR, Middlebury, VT (AFDC station 422115)”, https://chargecensus.com/stations/vermont/stone-cdjr-422115 (data as of October 12, 2026).