ChargeCensus

Onecc One Cc

Available

EV charging station in Burlington, Vermont on the ChargePoint network — 1 Level 2. US DOE AFDC station 252955.

At a glance

Onecc One Cc is a public EV charging station at 20 Allen Street in Burlington, Vermont, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 1, 2023.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID252955
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateFeb 1, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
20 Allen Street
State
Vermont
ZIP
05401
Coordinates
44.48456, -73.21514

Within ~15 km

Nearby charging

What kind of charging does Onecc One Cc offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 61% below the Vermont average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Onecc One Cc compare with other stations in Burlington?

Burlington has 104 charging stations in the DOE registry with 184 ports, the most of 122 cities and towns in Vermont. Onecc One Cc accounts for under 1% of the charging ports in Burlington. ChargePoint runs 87 stations in Burlington. Statewide, Vermont has 581 stations and 1,476 ports, the 31st-largest station count of the 51 states and DC. The biggest station in Vermont, OnLogic in South Burlington, has 24 ports.

Who operates Onecc One Cc?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 298 of those stations are in Vermont, 51% of the state's 581.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 1, 2023, one of 52 stations in Vermont with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Onecc One Cc have?

Onecc One Cc has 1 charging port: 1 Level 2.

Does Onecc One Cc have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does Onecc One Cc have?

Onecc One Cc has J1772 connectors.

Is Onecc One Cc open to the public?

Yes. Onecc One Cc is listed with public access, and its status is available.

Where is Onecc One Cc?

Onecc One Cc is at 20 Allen Street, Burlington, VT 05401. Its coordinates are 44.48456, -73.21514.

More EV charging around Burlington

Working with Vermont charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 252955, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Onecc One Cc, Burlington, VT (AFDC station 252955)”, https://chargecensus.com/stations/vermont/onecc-one-cc-252955 (data as of October 12, 2026).