ChargeCensus

Ned Rutland St1

Available

EV charging station in Rutland, Vermont on the ChargePoint network — 2 Level 2. US DOE AFDC station 189303.

At a glance

Ned Rutland St1 is a public EV charging station at 299 N Main St in Rutland, Vermont, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 6, 2021.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID189303
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateMay 6, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
299 N Main St
State
Vermont
ZIP
05701
Coordinates
43.63043, -72.97659

Within ~15 km

Nearby charging

What kind of charging does Ned Rutland St1 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 21% below the Vermont average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Ned Rutland St1 compare with other stations in Rutland?

Rutland has 18 charging stations in the DOE registry with 44 ports, the 6th-most of 122 cities and towns in Vermont. Ned Rutland St1 accounts for 5% of the charging ports in Rutland. ChargePoint runs 8 stations in Rutland. Statewide, Vermont has 581 stations and 1,476 ports, the 31st-largest station count of the 51 states and DC. The biggest station in Vermont, OnLogic in South Burlington, has 24 ports.

Who operates Ned Rutland St1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 298 of those stations are in Vermont, 51% of the state's 581.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 6, 2021, one of 74 stations in Vermont with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Ned Rutland St1 have?

Ned Rutland St1 has 2 charging ports: 2 Level 2.

Does Ned Rutland St1 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Ned Rutland St1 have?

Ned Rutland St1 has J1772 connectors.

Is Ned Rutland St1 open to the public?

Yes. Ned Rutland St1 is listed with public access, and its status is available.

Where is Ned Rutland St1?

Ned Rutland St1 is at 299 N Main St, Rutland, VT 05701. Its coordinates are 43.63043, -72.97659.

More EV charging around Rutland

Working with Vermont charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 189303, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Ned Rutland St1, Rutland, VT (AFDC station 189303)”, https://chargecensus.com/stations/vermont/ned-rutland-st1-189303 (data as of October 12, 2026).