ChargeCensus

Mansion Lot 1 Essex Resort 2

Available

EV charging station in Essex Junction, Vermont on the ChargePoint network — 2 Level 2. US DOE AFDC station 378080.

At a glance

Mansion Lot 1 Essex Resort 2 is a public EV charging station at 64 Essex Way in Essex Junction, Vermont, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 6, 2025.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID378080
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateFeb 6, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
64 Essex Way
City
Essex Junction
State
Vermont
ZIP
05452
Coordinates
44.50194, -73.07990

Within ~15 km

Nearby charging

What kind of charging does Mansion Lot 1 Essex Resort 2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 21% below the Vermont average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Mansion Lot 1 Essex Resort 2 compare with other stations in Essex Junction?

Essex Junction has 6 charging stations in the DOE registry with 12 ports, the 25th-most of 122 cities and towns in Vermont. Mansion Lot 1 Essex Resort 2 accounts for 17% of the charging ports in Essex Junction. ChargePoint runs 5 stations in Essex Junction. Statewide, Vermont has 581 stations and 1,476 ports, the 31st-largest station count of the 51 states and DC. The biggest station in Vermont, OnLogic in South Burlington, has 24 ports.

Who operates Mansion Lot 1 Essex Resort 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 298 of those stations are in Vermont, 51% of the state's 581.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 6, 2025, one of 110 stations in Vermont with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Mansion Lot 1 Essex Resort 2 have?

Mansion Lot 1 Essex Resort 2 has 2 charging ports: 2 Level 2.

Does Mansion Lot 1 Essex Resort 2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Mansion Lot 1 Essex Resort 2 have?

Mansion Lot 1 Essex Resort 2 has J1772 connectors.

Is Mansion Lot 1 Essex Resort 2 open to the public?

Yes. Mansion Lot 1 Essex Resort 2 is listed with public access, and its status is available.

Where is Mansion Lot 1 Essex Resort 2?

Mansion Lot 1 Essex Resort 2 is at 64 Essex Way, Essex Junction, VT 05452. Its coordinates are 44.50194, -73.07990.

More EV charging around Essex Junction

Working with Vermont charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 378080, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Mansion Lot 1 Essex Resort 2, Essex Junction, VT (AFDC station 378080)”, https://chargecensus.com/stations/vermont/mansion-lot-1-essex-resort-2-378080 (data as of October 12, 2026).