Green Mountain Power - Poultney
AvailableEV charging station in Poultney, Vermont on the FLO network — 1 DC fast. US DOE AFDC station 262693.
At a glance
Green Mountain Power - Poultney is a public EV charging station at 168 Church St in Poultney, Vermont, on the FLO network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Jun 14, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 262693 |
| Network | FLO |
| Status | Available (E) |
| Access | Public |
| Open date | Jun 14, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 168 Church St
- City
- Poultney
- State
- Vermont
- ZIP
- 05764
- Coordinates
- 43.51917, -73.23618
Within ~15 km
Nearby charging
- Dudleys Truck and Equipment6 ports
evGateway · Available
- Town of Fair Haven6 ports
Blink · Available
- GMP Poultney Office2 ports
Noodoe · Available
- Castleton Jeffords Center2 ports
ChargePoint · Available
What kind of charging does Green Mountain Power - Poultney offer?
Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 61% below the Vermont average of 2.5 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.
How does Green Mountain Power - Poultney compare with other stations in Poultney?
Poultney has 2 charging stations in the DOE registry with 3 ports. Green Mountain Power - Poultney accounts for 33% of the charging ports in Poultney. It is the only FLO station in Poultney. Statewide, Vermont has 581 stations and 1,476 ports, the 31st-largest station count of the 51 states and DC. The biggest station in Vermont, OnLogic in South Burlington, has 24 ports.
Who operates Green Mountain Power - Poultney?
FLO operates 1,246 stations in the registry across 40 states, with 179 DC fast and 2,934 Level 2 ports in total. 15 of those stations are in Vermont, 3% of the state's 581.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 14, 2023, one of 52 stations in Vermont with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Green Mountain Power - Poultney have?
Green Mountain Power - Poultney has 1 charging port: 1 DC fast.
Does Green Mountain Power - Poultney have DC fast charging?
Yes. The registry lists 1 DC fast port at Green Mountain Power - Poultney, with CHAdeMO and CCS connectors.
What connectors does Green Mountain Power - Poultney have?
Green Mountain Power - Poultney has CHAdeMO and CCS connectors.
Is Green Mountain Power - Poultney open to the public?
Yes. Green Mountain Power - Poultney is listed with public access, and its status is available.
Where is Green Mountain Power - Poultney?
Green Mountain Power - Poultney is at 168 Church St, Poultney, VT 05764. Its coordinates are 43.51917, -73.23618.
More EV charging around Poultney
Working with Vermont charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 262693, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Green Mountain Power - Poultney, Poultney, VT (AFDC station 262693)”, https://chargecensus.com/stations/vermont/green-mountain-power-poultney-262693 (data as of October 12, 2026).