EV charging station in Danville, Vermont on the FLO network — 1 DC fast. US DOE AFDC station 312506.

At a glance

Green Mountain Power - Danville is a public EV charging station at 421 US-2 in Danville, Vermont, on the FLO network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Oct 6, 2023.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID312506
NetworkFLO
StatusAvailable (E)
AccessPublic
Open dateOct 6, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

FLO

Operates 1,246 stations in the DOE registry — view the full network →

Location

Address
421 US-2
City
Danville
State
Vermont
ZIP
05828
Coordinates
44.41481, -72.13218

Within ~15 km

Nearby charging

What kind of charging does Green Mountain Power - Danville offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 61% below the Vermont average of 2.5 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Green Mountain Power - Danville compare with other stations in Danville?

Danville has 3 charging stations in the DOE registry with 3 ports. Green Mountain Power - Danville accounts for 33% of the charging ports in Danville. It is the only FLO station in Danville. Statewide, Vermont has 581 stations and 1,476 ports, the 31st-largest station count of the 51 states and DC. The biggest station in Vermont, OnLogic in South Burlington, has 24 ports.

Who operates Green Mountain Power - Danville?

FLO operates 1,246 stations in the registry across 40 states, with 179 DC fast and 2,934 Level 2 ports in total. 15 of those stations are in Vermont, 3% of the state's 581.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 6, 2023, one of 52 stations in Vermont with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Green Mountain Power - Danville have?

Green Mountain Power - Danville has 1 charging port: 1 DC fast.

Does Green Mountain Power - Danville have DC fast charging?

Yes. The registry lists 1 DC fast port at Green Mountain Power - Danville, with CHAdeMO and CCS connectors.

What connectors does Green Mountain Power - Danville have?

Green Mountain Power - Danville has CHAdeMO and CCS connectors.

Is Green Mountain Power - Danville open to the public?

Yes. Green Mountain Power - Danville is listed with public access, and its status is available.

Where is Green Mountain Power - Danville?

Green Mountain Power - Danville is at 421 US-2, Danville, VT 05828. Its coordinates are 44.41481, -72.13218.

More EV charging around Danville

Working with Vermont charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 312506, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Green Mountain Power - Danville, Danville, VT (AFDC station 312506)”, https://chargecensus.com/stations/vermont/green-mountain-power-danville-312506 (data as of October 12, 2026).