Grace Cottage Hospital, Townshend
AvailableEV charging station in Townshend, Vermont on the ViaLynk network — 2 DC fast. US DOE AFDC station 334452.
At a glance
Grace Cottage Hospital, Townshend is a public EV charging station at 185 Grafton road in Townshend, Vermont, on the ViaLynk network. It has 2 charging ports (2 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since May 2, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 334452 |
| Network | ViaLynk |
| Status | Available (E) |
| Access | Public |
| Open date | May 2, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 185 Grafton road
- City
- Townshend
- State
- Vermont
- ZIP
- 5353
- Coordinates
- 43.04964, -72.66743
Within ~15 km
Nearby charging
Tesla Destination · Available
- The Grafton Inn2 ports
Blink · Available
- Scott Farm Station 12 ports
ChargePoint · Available
ChargePoint · Available
ChargePoint · Available
ChargePoint · Available
What kind of charging does Grace Cottage Hospital, Townshend offer?
Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 21% below the Vermont average of 2.5 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.
How does Grace Cottage Hospital, Townshend compare with other stations in Townshend?
Townshend has 1 charging station in the DOE registry with 2 ports. It is the only ViaLynk station in Townshend. Statewide, Vermont has 581 stations and 1,476 ports, the 31st-largest station count of the 51 states and DC. The biggest station in Vermont, OnLogic in South Burlington, has 24 ports.
Who operates Grace Cottage Hospital, Townshend?
ViaLynk operates 1,012 stations in the registry across 35 states, with 616 DC fast and 4,903 Level 2 ports in total. 27 of those stations are in Vermont, 5% of the state's 581.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 2, 2024, one of 91 stations in Vermont with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Grace Cottage Hospital, Townshend have?
Grace Cottage Hospital, Townshend has 2 charging ports: 2 DC fast.
Does Grace Cottage Hospital, Townshend have DC fast charging?
Yes. The registry lists 2 DC fast ports at Grace Cottage Hospital, Townshend, with CHAdeMO and CCS connectors.
What connectors does Grace Cottage Hospital, Townshend have?
Grace Cottage Hospital, Townshend has CHAdeMO and CCS connectors.
Is Grace Cottage Hospital, Townshend open to the public?
Yes. Grace Cottage Hospital, Townshend is listed with public access, and its status is available.
Where is Grace Cottage Hospital, Townshend?
Grace Cottage Hospital, Townshend is at 185 Grafton road, Townshend, VT 5353. Its coordinates are 43.04964, -72.66743.
More EV charging around Townshend
Working with Vermont charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 334452, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Grace Cottage Hospital, Townshend, Townshend, VT (AFDC station 334452)”, https://chargecensus.com/stations/vermont/grace-cottage-hospital-townshend-334452 (data as of October 12, 2026).