Essex Junction Railroad St
AvailableEV charging station in Essex Junction, Vermont on the ChargePoint network — 2 Level 2. US DOE AFDC station 357652.
At a glance
Essex Junction Railroad St is a public EV charging station at 131 Railroad St in Essex Junction, Vermont, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 8, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 357652 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Oct 8, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 131 Railroad St
- City
- Essex Junction
- State
- Vermont
- ZIP
- 05452
- Coordinates
- 44.48961, -73.11011
Within ~15 km
Nearby charging
- OnLogic24 ports
ViaLynk · Available
- Green Mountain Power19 ports
Non-networked · Available
Tesla Destination · Available
Epic Charging · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
What kind of charging does Essex Junction Railroad St offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 21% below the Vermont average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Essex Junction Railroad St compare with other stations in Essex Junction?
Essex Junction has 6 charging stations in the DOE registry with 12 ports, the 25th-most of 122 cities and towns in Vermont. Essex Junction Railroad St accounts for 17% of the charging ports in Essex Junction. ChargePoint runs 5 stations in Essex Junction. Statewide, Vermont has 581 stations and 1,476 ports, the 31st-largest station count of the 51 states and DC. The biggest station in Vermont, OnLogic in South Burlington, has 24 ports.
Who operates Essex Junction Railroad St?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 298 of those stations are in Vermont, 51% of the state's 581.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 8, 2024, one of 91 stations in Vermont with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Essex Junction Railroad St have?
Essex Junction Railroad St has 2 charging ports: 2 Level 2.
Does Essex Junction Railroad St have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Essex Junction Railroad St have?
Essex Junction Railroad St has J1772 connectors.
Is Essex Junction Railroad St open to the public?
Yes. Essex Junction Railroad St is listed with public access, and its status is available.
Where is Essex Junction Railroad St?
Essex Junction Railroad St is at 131 Railroad St, Essex Junction, VT 05452. Its coordinates are 44.48961, -73.11011.
More EV charging around Essex Junction
Working with Vermont charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 357652, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Essex Junction Railroad St, Essex Junction, VT (AFDC station 357652)”, https://chargecensus.com/stations/vermont/essex-junction-railroad-st-357652 (data as of October 12, 2026).