Charge With US 38 Eastwood
AvailableEV charging station in South Burlington, Vermont on the ChargePoint network — 2 Level 2. US DOE AFDC station 350041.
At a glance
Charge With US 38 Eastwood is a public EV charging station at 38 Eastwood Dr in South Burlington, Vermont, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 6, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 350041 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jul 6, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 38 Eastwood Dr
- City
- South Burlington
- State
- Vermont
- ZIP
- 05403
- Coordinates
- 44.44980, -73.20296
Within ~15 km
Nearby charging
- OnLogic24 ports
ViaLynk · Available
- Green Mountain Power19 ports
Non-networked · Available
Tesla Destination · Available
Epic Charging · Available
Tesla Supercharger · Available
Non-networked · Available
What kind of charging does Charge With US 38 Eastwood offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 21% below the Vermont average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Charge With US 38 Eastwood compare with other stations in South Burlington?
South Burlington has 45 charging stations in the DOE registry with 132 ports, the 2nd-most of 122 cities and towns in Vermont. Charge With US 38 Eastwood accounts for 2% of the charging ports in South Burlington. ChargePoint runs 27 stations in South Burlington. Statewide, Vermont has 581 stations and 1,476 ports, the 31st-largest station count of the 51 states and DC. The biggest station in Vermont, OnLogic in South Burlington, has 24 ports.
Who operates Charge With US 38 Eastwood?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 298 of those stations are in Vermont, 51% of the state's 581.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 6, 2024, one of 91 stations in Vermont with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Charge With US 38 Eastwood have?
Charge With US 38 Eastwood has 2 charging ports: 2 Level 2.
Does Charge With US 38 Eastwood have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Charge With US 38 Eastwood have?
Charge With US 38 Eastwood has J1772 connectors.
Is Charge With US 38 Eastwood open to the public?
Yes. Charge With US 38 Eastwood is listed with public access, and its status is available.
Where is Charge With US 38 Eastwood?
Charge With US 38 Eastwood is at 38 Eastwood Dr, South Burlington, VT 05403. Its coordinates are 44.44980, -73.20296.
More EV charging around South Burlington
Working with Vermont charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 350041, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Charge With US 38 Eastwood, South Burlington, VT (AFDC station 350041)”, https://chargecensus.com/stations/vermont/charge-with-us-38-eastwood-350041 (data as of October 12, 2026).