Ces Station 1 Parking Lot #2
AvailableEV charging station in Cambridge, Vermont on the ChargePoint network — 2 Level 2. US DOE AFDC station 357222.
At a glance
Ces Station 1 Parking Lot #2 is a public EV charging station at 186 School Rd in Cambridge, Vermont, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 28, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 357222 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Sep 28, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 186 School Rd
- City
- Cambridge
- State
- Vermont
- ZIP
- 05444
- Coordinates
- 44.64477, -72.82608
Within ~15 km
Nearby charging
- Johnson Jolley6 ports
Blink · Available
- Johnson Town Office4 ports
Non-networked · Available
Tesla Destination · Available
- Stowe Mountain Resort 22 ports
AmpUp · Available
- Union Bank Jericho Ev12 ports
ChargePoint · Available
- Falcons@Smuggs! Station 12 ports
ChargePoint · Available
What kind of charging does Ces Station 1 Parking Lot #2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 21% below the Vermont average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Ces Station 1 Parking Lot #2 compare with other stations in Cambridge?
Cambridge has 3 charging stations in the DOE registry with 6 ports. Ces Station 1 Parking Lot #2 accounts for 33% of the charging ports in Cambridge. ChargePoint runs 3 stations in Cambridge. Statewide, Vermont has 581 stations and 1,476 ports, the 31st-largest station count of the 51 states and DC. The biggest station in Vermont, OnLogic in South Burlington, has 24 ports.
Who operates Ces Station 1 Parking Lot #2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 298 of those stations are in Vermont, 51% of the state's 581.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 28, 2024, one of 91 stations in Vermont with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Ces Station 1 Parking Lot #2 have?
Ces Station 1 Parking Lot #2 has 2 charging ports: 2 Level 2.
Does Ces Station 1 Parking Lot #2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Ces Station 1 Parking Lot #2 have?
Ces Station 1 Parking Lot #2 has J1772 connectors.
Is Ces Station 1 Parking Lot #2 open to the public?
Yes. Ces Station 1 Parking Lot #2 is listed with public access, and its status is available.
Where is Ces Station 1 Parking Lot #2?
Ces Station 1 Parking Lot #2 is at 186 School Rd, Cambridge, VT 05444. Its coordinates are 44.64477, -72.82608.
More EV charging around Cambridge
Working with Vermont charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 357222, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Ces Station 1 Parking Lot #2, Cambridge, VT (AFDC station 357222)”, https://chargecensus.com/stations/vermont/ces-station-1-parking-lot-2-357222 (data as of October 12, 2026).