Burlington Electric, Electric Avenue

Available

EV charging station in Burlington, Vermont on the AmpUp network — 1 Level 2. US DOE AFDC station 319390.

At a glance

Burlington Electric, Electric Avenue is a public EV charging station at 585 Pine St in Burlington, Vermont, on the AmpUp network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 18, 2023.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID319390
NetworkAmpUp
StatusAvailable (E)
AccessPublic
FacilityUtility
Open dateJul 18, 2023
Last updated at sourceOct 2, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

AmpUp

Operates 1,322 stations in the DOE registry — view the full network →

Location

Address
585 Pine St
State
Vermont
ZIP
05401
Coordinates
44.46313, -73.21510

Within ~15 km

Nearby charging

What kind of charging does Burlington Electric, Electric Avenue offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 61% below the Vermont average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a utility location.

How does Burlington Electric, Electric Avenue compare with other stations in Burlington?

Burlington has 104 charging stations in the DOE registry with 184 ports, the most of 122 cities and towns in Vermont. Burlington Electric, Electric Avenue accounts for under 1% of the charging ports in Burlington. AmpUp runs 7 stations in Burlington. Statewide, Vermont has 581 stations and 1,476 ports, the 31st-largest station count of the 51 states and DC. The biggest station in Vermont, OnLogic in South Burlington, has 24 ports.

Who operates Burlington Electric, Electric Avenue?

AmpUp operates 1,322 stations in the registry across 47 states, with 18 DC fast and 5,339 Level 2 ports in total. 23 of those stations are in Vermont, 4% of the state's 581.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 18, 2023, one of 52 stations in Vermont with a 2023 open date. The station's record was last updated at the source on Oct 2, 2026.

Frequently asked questions

How many chargers does Burlington Electric, Electric Avenue have?

Burlington Electric, Electric Avenue has 1 charging port: 1 Level 2.

Does Burlington Electric, Electric Avenue have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does Burlington Electric, Electric Avenue have?

Burlington Electric, Electric Avenue has J1772 connectors.

Is Burlington Electric, Electric Avenue open to the public?

Yes. Burlington Electric, Electric Avenue is listed with public access, and its status is available.

Where is Burlington Electric, Electric Avenue?

Burlington Electric, Electric Avenue is at 585 Pine St, Burlington, VT 05401. Its coordinates are 44.46313, -73.21510.

More EV charging around Burlington

Working with Vermont charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 319390, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Burlington Electric, Electric Avenue, Burlington, VT (AFDC station 319390)”, https://chargecensus.com/stations/vermont/burlington-electric-electric-avenue-319390 (data as of October 12, 2026).