Baker Stations South Main Left
AvailableEV charging station in Waterbury, Vermont on the ChargePoint network — 1 Level 2. US DOE AFDC station 374803.
At a glance
Baker Stations South Main Left is a public EV charging station at 100 South Main Street in Waterbury, Vermont, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 2, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 374803 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 2, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
- Waterbury Pilgrim Park8 ports
Red E · Available
Red E · Available
- Ben & Jerry's - Waterbury4 ports
Blink · Available
Blink · Available
- Suncommon3 ports
Non-networked · Available
- Lawson'S Finest Station 52 ports
ChargePoint · Available
What kind of charging does Baker Stations South Main Left offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 61% below the Vermont average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Baker Stations South Main Left compare with other stations in Waterbury?
Waterbury has 14 charging stations in the DOE registry with 36 ports, the 8th-most of 122 cities and towns in Vermont. Baker Stations South Main Left accounts for 3% of the charging ports in Waterbury. ChargePoint runs 6 stations in Waterbury. Statewide, Vermont has 581 stations and 1,476 ports, the 31st-largest station count of the 51 states and DC. The biggest station in Vermont, OnLogic in South Burlington, has 24 ports.
Who operates Baker Stations South Main Left?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 298 of those stations are in Vermont, 51% of the state's 581.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 2, 2025, one of 110 stations in Vermont with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Baker Stations South Main Left have?
Baker Stations South Main Left has 1 charging port: 1 Level 2.
Does Baker Stations South Main Left have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Baker Stations South Main Left have?
Baker Stations South Main Left has J1772 connectors.
Is Baker Stations South Main Left open to the public?
Yes. Baker Stations South Main Left is listed with public access, and its status is available.
Where is Baker Stations South Main Left?
Baker Stations South Main Left is at 100 South Main Street, Waterbury, VT 05676. Its coordinates are 44.33311, -72.75126.
More EV charging around Waterbury
Working with Vermont charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 374803, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Baker Stations South Main Left, Waterbury, VT (AFDC station 374803)”, https://chargecensus.com/stations/vermont/baker-stations-south-main-left-374803 (data as of October 12, 2026).