ChargeCensus

Baker Stations Rolling Mdws Rt

Available

EV charging station in Waterbury, Vermont on the ChargePoint network — 1 Level 2. US DOE AFDC station 384126.

At a glance

Baker Stations Rolling Mdws Rt is a public EV charging station at Rolling Meadows Lane in Waterbury, Vermont, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 13, 2025.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID384126
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateFeb 13, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
Rolling Meadows Lane
State
Vermont
ZIP
05676
Coordinates
44.34290, -72.74547

Within ~15 km

Nearby charging

What kind of charging does Baker Stations Rolling Mdws Rt offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 61% below the Vermont average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Baker Stations Rolling Mdws Rt compare with other stations in Waterbury?

Waterbury has 14 charging stations in the DOE registry with 36 ports, the 8th-most of 122 cities and towns in Vermont. Baker Stations Rolling Mdws Rt accounts for 3% of the charging ports in Waterbury. ChargePoint runs 6 stations in Waterbury. Statewide, Vermont has 581 stations and 1,476 ports, the 31st-largest station count of the 51 states and DC. The biggest station in Vermont, OnLogic in South Burlington, has 24 ports.

Who operates Baker Stations Rolling Mdws Rt?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 298 of those stations are in Vermont, 51% of the state's 581.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 13, 2025, one of 110 stations in Vermont with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Baker Stations Rolling Mdws Rt have?

Baker Stations Rolling Mdws Rt has 1 charging port: 1 Level 2.

Does Baker Stations Rolling Mdws Rt have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does Baker Stations Rolling Mdws Rt have?

Baker Stations Rolling Mdws Rt has J1772 connectors.

Is Baker Stations Rolling Mdws Rt open to the public?

Yes. Baker Stations Rolling Mdws Rt is listed with public access, and its status is available.

Where is Baker Stations Rolling Mdws Rt?

Baker Stations Rolling Mdws Rt is at Rolling Meadows Lane, Waterbury, VT 05676. Its coordinates are 44.34290, -72.74547.

More EV charging around Waterbury

Working with Vermont charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 384126, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Baker Stations Rolling Mdws Rt, Waterbury, VT (AFDC station 384126)”, https://chargecensus.com/stations/vermont/baker-stations-rolling-mdws-rt-384126 (data as of October 12, 2026).