ChargeCensus

B E Chargers Be06

Available

EV charging station in Burlington, Vermont on the ChargePoint network — 1 DC fast. US DOE AFDC station 372815.

At a glance

B E Chargers Be06 is a public EV charging station at 47 S Winooski Ave in Burlington, Vermont, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Dec 12, 2024.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID372815
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateDec 12, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
47 S Winooski Ave
State
Vermont
ZIP
05401
Coordinates
44.47862, -73.21170

Within ~15 km

Nearby charging

What kind of charging does B E Chargers Be06 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 61% below the Vermont average of 2.5 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does B E Chargers Be06 compare with other stations in Burlington?

Burlington has 104 charging stations in the DOE registry with 184 ports, the most of 122 cities and towns in Vermont. B E Chargers Be06 accounts for under 1% of the charging ports in Burlington. ChargePoint runs 87 stations in Burlington. Statewide, Vermont has 581 stations and 1,476 ports, the 31st-largest station count of the 51 states and DC. The biggest station in Vermont, OnLogic in South Burlington, has 24 ports.

Who operates B E Chargers Be06?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 298 of those stations are in Vermont, 51% of the state's 581.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 12, 2024, one of 91 stations in Vermont with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does B E Chargers Be06 have?

B E Chargers Be06 has 1 charging port: 1 DC fast.

Does B E Chargers Be06 have DC fast charging?

Yes. The registry lists 1 DC fast port at B E Chargers Be06, with CHAdeMO and CCS connectors.

What connectors does B E Chargers Be06 have?

B E Chargers Be06 has CHAdeMO and CCS connectors.

Is B E Chargers Be06 open to the public?

Yes. B E Chargers Be06 is listed with public access, and its status is available.

Where is B E Chargers Be06?

B E Chargers Be06 is at 47 S Winooski Ave, Burlington, VT 05401. Its coordinates are 44.47862, -73.21170.

More EV charging around Burlington

Working with Vermont charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 372815, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “B E Chargers Be06, Burlington, VT (AFDC station 372815)”, https://chargecensus.com/stations/vermont/b-e-chargers-be06-372815 (data as of October 12, 2026).