Wcl Swb - West
AvailableEV charging station in Roy, Utah on the ChargePoint network — 2 Level 2. US DOE AFDC station 390937.
At a glance
Wcl Swb - West is a public EV charging station at 2039 West 4000 South in Roy, Utah, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 26, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 390937 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Apr 26, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 2039 West 4000 South
- City
- Roy
- State
- Utah
- ZIP
- 84067
- Coordinates
- 41.19009, -112.02926
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- America First Credit Union8 ports
Powerpump · Available
Electrify America · Available
Tesla Supercharger · Available
- Walmart EV Charging8 ports
Walmart · Available
- RMP Davis (Layton, UT)6 ports
Electrify America · Available
What kind of charging does Wcl Swb - West offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 37% below the Utah average of 3.2 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Wcl Swb - West compare with other stations in Roy?
Roy has 3 charging stations in the DOE registry with 6 ports. Wcl Swb - West accounts for 33% of the charging ports in Roy. ChargePoint runs 3 stations in Roy. Statewide, Utah has 1,090 stations and 3,472 ports, the 23rd-largest station count of the 51 states and DC. The biggest station in Utah, Avia - The Exchange Apartments - SLC in Salt Lake City, has 38 ports.
Who operates Wcl Swb - West?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 670 of those stations are in Utah, 61% of the state's 1,090.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 26, 2025, one of 142 stations in Utah with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Wcl Swb - West have?
Wcl Swb - West has 2 charging ports: 2 Level 2.
Does Wcl Swb - West have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Wcl Swb - West have?
Wcl Swb - West has J1772 connectors.
Is Wcl Swb - West open to the public?
Yes. Wcl Swb - West is listed with public access, and its status is available.
Where is Wcl Swb - West?
Wcl Swb - West is at 2039 West 4000 South, Roy, UT 84067. Its coordinates are 41.19009, -112.02926.
More EV charging around Roy
Working with Utah charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 390937, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Wcl Swb - West, Roy, UT (AFDC station 390937)”, https://chargecensus.com/stations/utah/wcl-swb-west-390937 (data as of October 12, 2026).