The Howick Right Parking
AvailableEV charging station in Millcreek, Utah on the ChargePoint network — 2 Level 2. US DOE AFDC station 457098.
At a glance
The Howick Right Parking is a public EV charging station at 4101 S Howick St in Millcreek, Utah, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 4, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 457098 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Apr 4, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 4101 S Howick St
- City
- Millcreek
- State
- Utah
- ZIP
- 84107
- Coordinates
- 40.68321, -111.89678
Within ~15 km
Nearby charging
OpConnect · Available
- Mountain America Credit Union33 ports
Powerpump · Available
Turnongreen · Available
- South City26 ports
Blink · Available
bp pulse · Available
Tesla Supercharger · Available
What kind of charging does The Howick Right Parking offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 37% below the Utah average of 3.2 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does The Howick Right Parking compare with other stations in Millcreek?
Millcreek has 9 charging stations in the DOE registry with 23 ports. The Howick Right Parking accounts for 9% of the charging ports in Millcreek. ChargePoint runs 6 stations in Millcreek. Statewide, Utah has 1,090 stations and 3,472 ports, the 23rd-largest station count of the 51 states and DC. The biggest station in Utah, Avia - The Exchange Apartments - SLC in Salt Lake City, has 38 ports.
Who operates The Howick Right Parking?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 670 of those stations are in Utah, 61% of the state's 1,090.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 4, 2026, one of 117 stations in Utah with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does The Howick Right Parking have?
The Howick Right Parking has 2 charging ports: 2 Level 2.
Does The Howick Right Parking have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does The Howick Right Parking have?
The Howick Right Parking has J1772 connectors.
Is The Howick Right Parking open to the public?
Yes. The Howick Right Parking is listed with public access, and its status is available.
Where is The Howick Right Parking?
The Howick Right Parking is at 4101 S Howick St, Millcreek, UT 84107. Its coordinates are 40.68321, -111.89678.
More EV charging around Millcreek
Working with Utah charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 457098, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “The Howick Right Parking, Millcreek, UT (AFDC station 457098)”, https://chargecensus.com/stations/utah/the-howick-right-parking-457098 (data as of October 12, 2026).