State Of Utah Udot South Hq1
AvailableEV charging station in Taylorsville, Utah on the ChargePoint network — 2 Level 2. US DOE AFDC station 175112.
At a glance
State Of Utah Udot South Hq1 is a public EV charging station at 2600 W 4700 S in Taylorsville, Utah, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 27, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 175112 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 27, 2021 |
| Last updated at source | Oct 19, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 2600 W 4700 S
- City
- Taylorsville
- State
- Utah
- ZIP
- 84129
- Coordinates
- 40.67032, -111.95599
Within ~15 km
Nearby charging
OpConnect · Available
- Mountain America Credit Union33 ports
Powerpump · Available
Turnongreen · Available
- South City26 ports
Blink · Available
bp pulse · Available
Tesla Supercharger · Available
What kind of charging does State Of Utah Udot South Hq1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 37% below the Utah average of 3.2 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does State Of Utah Udot South Hq1 compare with other stations in Taylorsville?
Taylorsville has 43 charging stations in the DOE registry with 96 ports, the 5th-most of 120 cities and towns in Utah. State Of Utah Udot South Hq1 accounts for 2% of the charging ports in Taylorsville. ChargePoint runs 39 stations in Taylorsville. Statewide, Utah has 1,093 stations and 3,478 ports, the 23rd-largest station count of the 51 states and DC. The biggest station in Utah, Avia - The Exchange Apartments - SLC in Salt Lake City, has 38 ports.
Who operates State Of Utah Udot South Hq1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,969 stations in the registry across 52 states, with 5,026 DC fast and 83,347 Level 2 ports in total. 670 of those stations are in Utah, 61% of the state's 1,093.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 27, 2021, one of 232 stations in Utah with a 2021 open date. The station's record was last updated at the source on Oct 19, 2026.
Frequently asked questions
How many chargers does State Of Utah Udot South Hq1 have?
State Of Utah Udot South Hq1 has 2 charging ports: 2 Level 2.
Does State Of Utah Udot South Hq1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does State Of Utah Udot South Hq1 have?
State Of Utah Udot South Hq1 has J1772 connectors.
Is State Of Utah Udot South Hq1 open to the public?
Yes. State Of Utah Udot South Hq1 is listed with public access, and its status is available.
Where is State Of Utah Udot South Hq1?
State Of Utah Udot South Hq1 is at 2600 W 4700 S, Taylorsville, UT 84129. Its coordinates are 40.67032, -111.95599.
More EV charging around Taylorsville
Working with Utah charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 175112, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 19, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “State Of Utah Udot South Hq1, Taylorsville, UT (AFDC station 175112)”, https://chargecensus.com/stations/utah/state-of-utah-udot-south-hq1-175112 (data as of October 19, 2026).