ChargeCensus

Sco Fillmore1

Available

EV charging station in Fillmore, Utah on the ChargePoint network — 2 Level 2. US DOE AFDC station 155294.

At a glance

Sco Fillmore1 is a public EV charging station at 674 UT-99 in Fillmore, Utah, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 10, 2020.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
Location

Station record

DOE registry record

FieldValue
AFDC station ID155294
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateApr 10, 2020
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
674 UT-99
City
Fillmore
State
Utah
ZIP
84631
Coordinates
38.95421, -112.34037

Within ~15 km

Nearby charging

No other registered stations within ~15 km.

What kind of charging does Sco Fillmore1 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 37% below the Utah average of 3.2 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Sco Fillmore1 compare with other stations in Fillmore?

Fillmore has 1 charging station in the DOE registry with 2 ports. It is the only ChargePoint station in Fillmore. Statewide, Utah has 1,090 stations and 3,472 ports, the 23rd-largest station count of the 51 states and DC. The biggest station in Utah, Avia - The Exchange Apartments - SLC in Salt Lake City, has 38 ports.

Who operates Sco Fillmore1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 670 of those stations are in Utah, 61% of the state's 1,090.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 10, 2020, one of 124 stations in Utah with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Sco Fillmore1 have?

Sco Fillmore1 has 2 charging ports: 2 Level 2.

Does Sco Fillmore1 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Sco Fillmore1 have?

Sco Fillmore1 has J1772 connectors.

Is Sco Fillmore1 open to the public?

Yes. Sco Fillmore1 is listed with public access, and its status is available.

Where is Sco Fillmore1?

Sco Fillmore1 is at 674 UT-99, Fillmore, UT 84631. Its coordinates are 38.95421, -112.34037.

More EV charging around Fillmore

Working with Utah charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 155294, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Sco Fillmore1, Fillmore, UT (AFDC station 155294)”, https://chargecensus.com/stations/utah/sco-fillmore1-155294 (data as of October 12, 2026).