Providence City City Hall
AvailableEV charging station in Providence, Utah on the ChargePoint network — 2 Level 2. US DOE AFDC station 213985.
At a glance
Providence City City Hall is a public EV charging station at 164 N Gateway Dr in Providence, Utah, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 14, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 213985 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Apr 14, 2022 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 164 N Gateway Dr
- City
- Providence
- State
- Utah
- ZIP
- 84332
- Coordinates
- 41.71126, -111.82865
Within ~15 km
Nearby charging
- Smith's - Tesla Supercharger8 ports
Tesla Supercharger · Available
- Third & First - Logan, UT6 ports
EV Range · Available
- ASPIRE Research Center5 ports
Non-networked · Available
- Wilson Motors Co - Series4 ports
Blink · Temporarily unavailable
EV Range · Available
- Wilson Motors Co - DCFC4 ports
Blink · Available
What kind of charging does Providence City City Hall offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 37% below the Utah average of 3.2 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Providence City City Hall compare with other stations in Providence?
Providence has 3 charging stations in the DOE registry with 6 ports. Providence City City Hall accounts for 33% of the charging ports in Providence. ChargePoint runs 3 stations in Providence. Statewide, Utah has 1,090 stations and 3,472 ports, the 23rd-largest station count of the 51 states and DC. The biggest station in Utah, Avia - The Exchange Apartments - SLC in Salt Lake City, has 38 ports.
Who operates Providence City City Hall?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 670 of those stations are in Utah, 61% of the state's 1,090.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 14, 2022, one of 107 stations in Utah with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Providence City City Hall have?
Providence City City Hall has 2 charging ports: 2 Level 2.
Does Providence City City Hall have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Providence City City Hall have?
Providence City City Hall has J1772 connectors.
Is Providence City City Hall open to the public?
Yes. Providence City City Hall is listed with public access, and its status is available.
Where is Providence City City Hall?
Providence City City Hall is at 164 N Gateway Dr, Providence, UT 84332. Its coordinates are 41.71126, -111.82865.
More EV charging around Providence
Working with Utah charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 213985, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Providence City City Hall, Providence, UT (AFDC station 213985)”, https://chargecensus.com/stations/utah/providence-city-city-hall-213985 (data as of October 12, 2026).