Mikes Market Bert
AvailableEV charging station in Garden City, Utah on the ChargePoint network — 1 DC fast. US DOE AFDC station 204746.
At a glance
Mikes Market Bert is a public EV charging station at 601 N Bear Lake Blvd in Garden City, Utah, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Jan 14, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 204746 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 14, 2022 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 601 N Bear Lake Blvd
- City
- Garden City
- State
- Utah
- ZIP
- 84028
- Coordinates
- 41.95707, -111.39897
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- State Of Utah Gc West St11 ports
ChargePoint · Available
- State Of Utah Gc East St11 ports
ChargePoint · Available
- Mikes Market Ernie1 ports
ChargePoint · Temporarily unavailable
What kind of charging does Mikes Market Bert offer?
Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 69% below the Utah average of 3.2 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.
How does Mikes Market Bert compare with other stations in Garden City?
Garden City has 5 charging stations in the DOE registry with 8 ports. Mikes Market Bert accounts for 13% of the charging ports in Garden City. ChargePoint runs 4 stations in Garden City. Statewide, Utah has 1,090 stations and 3,472 ports, the 23rd-largest station count of the 51 states and DC. The biggest station in Utah, Avia - The Exchange Apartments - SLC in Salt Lake City, has 38 ports.
Who operates Mikes Market Bert?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 670 of those stations are in Utah, 61% of the state's 1,090.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 14, 2022, one of 107 stations in Utah with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Mikes Market Bert have?
Mikes Market Bert has 1 charging port: 1 DC fast.
Does Mikes Market Bert have DC fast charging?
Yes. The registry lists 1 DC fast port at Mikes Market Bert, with CHAdeMO and CCS connectors.
What connectors does Mikes Market Bert have?
Mikes Market Bert has CHAdeMO and CCS connectors.
Is Mikes Market Bert open to the public?
Yes. Mikes Market Bert is listed with public access, and its status is available.
Where is Mikes Market Bert?
Mikes Market Bert is at 601 N Bear Lake Blvd, Garden City, UT 84028. Its coordinates are 41.95707, -111.39897.
More EV charging around Garden City
Working with Utah charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 204746, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Mikes Market Bert, Garden City, UT (AFDC station 204746)”, https://chargecensus.com/stations/utah/mikes-market-bert-204746 (data as of October 12, 2026).