Duraline
AvailableEV charging station in North Salt Lake, Utah on the Turnongreen network — 6 Level 2. US DOE AFDC station 455427.
At a glance
Duraline is a public EV charging station at 80 East Union Avenue in North Salt Lake, Utah, on the Turnongreen network. It has 6 charging ports (6 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 18, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 455427 |
| Network | Turnongreen |
| Status | Available (E) |
| Access | Public |
| Open date | Mar 18, 2026 |
| Last updated at source | Apr 14, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 80 East Union Avenue
- City
- North Salt Lake
- State
- Utah
- ZIP
- 84054
- Coordinates
- 40.85760, -111.90951
Within ~15 km
Nearby charging
OpConnect · Available
Turnongreen · Available
- South City26 ports
Blink · Available
bp pulse · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
What kind of charging does Duraline offer?
Of its 6 ports, 6 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 88% above the Utah average of 3.2 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Duraline compare with other stations in North Salt Lake?
North Salt Lake has 11 charging stations in the DOE registry with 41 ports, the 20th-most of 119 cities and towns in Utah. Duraline accounts for 15% of the charging ports in North Salt Lake. It is the only Turnongreen station in North Salt Lake. Statewide, Utah has 1,090 stations and 3,472 ports, the 23rd-largest station count of the 51 states and DC. The biggest station in Utah, Avia - The Exchange Apartments - SLC in Salt Lake City, has 38 ports.
Who operates Duraline?
Turnongreen operates 150 stations in the registry across 34 states, with 16 DC fast and 458 Level 2 ports in total. 4 of those stations are in Utah, under 1% of the state's 1,090.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 18, 2026, one of 117 stations in Utah with a 2026 open date. The station's record was last updated at the source on Apr 14, 2026.
Frequently asked questions
How many chargers does Duraline have?
Duraline has 6 charging ports: 6 Level 2.
Does Duraline have DC fast charging?
No. The registry lists no DC fast ports here; its 6 ports are all Level 2.
What connectors does Duraline have?
Duraline has J1772 connectors.
Is Duraline open to the public?
Yes. Duraline is listed with public access, and its status is available.
Where is Duraline?
Duraline is at 80 East Union Avenue, North Salt Lake, UT 84054. Its coordinates are 40.85760, -111.90951.
More EV charging around North Salt Lake
Working with Utah charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 455427, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Duraline, North Salt Lake, UT (AFDC station 455427)”, https://chargecensus.com/stations/utah/duraline-455427 (data as of October 12, 2026).