ChargeCensus

City Hall

Available

EV charging station in Marriott-Slaterville, Utah on the Loop network — 1 Level 2. US DOE AFDC station 453205.

At a glance

City Hall is a public EV charging station at 1570 W 400 N in Marriott-Slaterville, Utah, on the Loop network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 13, 2025.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID453205
NetworkLoop
StatusAvailable (E)
AccessPublic
FacilityOther
Open dateNov 13, 2025
Last updated at sourceSep 22, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: $15 monthly service fee; $0.15 per kWh

Charging network

Loop

Operates 1,233 stations in the DOE registry — view the full network →

Location

Address
1570 W 400 N
City
Marriott-Slaterville
State
Utah
ZIP
84404
Coordinates
41.26817, -112.01844

Within ~15 km

Nearby charging

What kind of charging does City Hall offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 69% below the Utah average of 3.2 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$15 monthly service fee; $0.15 per kWh”. The site is listed as a other location.

How does City Hall compare with other stations in Marriott-Slaterville?

Marriott-Slaterville has 1 charging station in the DOE registry with 1 ports. It is the only Loop station in Marriott-Slaterville. Statewide, Utah has 1,090 stations and 3,472 ports, the 23rd-largest station count of the 51 states and DC. The biggest station in Utah, Avia - The Exchange Apartments - SLC in Salt Lake City, has 38 ports.

Who operates City Hall?

Loop operates 1,233 stations in the registry across 40 states, with 162 DC fast and 9,900 Level 2 ports in total. 9 of those stations are in Utah, under 1% of the state's 1,090.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 13, 2025, one of 142 stations in Utah with a 2025 open date. The station's record was last updated at the source on Sep 22, 2026.

Frequently asked questions

How many chargers does City Hall have?

City Hall has 1 charging port: 1 Level 2.

Does City Hall have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does City Hall have?

City Hall has J1772 connectors.

Is charging at City Hall free?

Pricing as reported to the DOE registry: $15 monthly service fee; $0.15 per kWh.

Is City Hall open to the public?

Yes. City Hall is listed with public access, and its status is available.

Where is City Hall?

City Hall is at 1570 W 400 N, Marriott-Slaterville, UT 84404. Its coordinates are 41.26817, -112.01844.

More EV charging around Marriott-Slaterville

Working with Utah charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 453205, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “City Hall, Marriott-Slaterville, UT (AFDC station 453205)”, https://chargecensus.com/stations/utah/city-hall-453205 (data as of October 12, 2026).