ChargeCensus

Building P2

Available

EV charging station in Washington, Utah on the Blink network — 2 Level 2. US DOE AFDC station 450855.

At a glance

Building P2 is a public EV charging station at 845 East Desert Cactus Drive in Washington, Utah, on the Blink network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 6, 2026.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID450855
NetworkBlink
StatusAvailable (E)
AccessPublic
Open dateFeb 6, 2026
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
845 East Desert Cactus Drive
City
Washington
State
Utah
ZIP
84780
Coordinates
37.12813, -113.49619

Within ~15 km

Nearby charging

What kind of charging does Building P2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 37% below the Utah average of 3.2 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Building P2 compare with other stations in Washington?

Washington has 8 charging stations in the DOE registry with 40 ports. Building P2 accounts for 5% of the charging ports in Washington. Blink runs 4 stations in Washington. Statewide, Utah has 1,090 stations and 3,472 ports, the 23rd-largest station count of the 51 states and DC. The biggest station in Utah, Avia - The Exchange Apartments - SLC in Salt Lake City, has 38 ports.

Who operates Building P2?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 69 of those stations are in Utah, 6% of the state's 1,090.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 6, 2026, one of 117 stations in Utah with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Building P2 have?

Building P2 has 2 charging ports: 2 Level 2.

Does Building P2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Building P2 have?

Building P2 has J1772 connectors.

Is Building P2 open to the public?

Yes. Building P2 is listed with public access, and its status is available.

Where is Building P2?

Building P2 is at 845 East Desert Cactus Drive, Washington, UT 84780. Its coordinates are 37.12813, -113.49619.

More EV charging around Washington

Working with Utah charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 450855, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Building P2, Washington, UT (AFDC station 450855)”, https://chargecensus.com/stations/utah/building-p2-450855 (data as of October 12, 2026).