ChargeCensus

Applied Excavation

Available

EV charging station in Salt Lake City, Utah on the Powerpump network — 2 DC fast · 6 Level 2. US DOE AFDC station 349793.

Total ports
8
DC fast
2
Level 2
6
Access
Private
workplace charging
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID349793
NetworkPowerpump
StatusAvailable (E)
AccessPrivate
FacilityFactory
Open dateMar 4, 2024
Last updated at sourceJul 15, 2026

Plugs

Connectors & pricing

  • J1772The standard Level 1/2 AC connector.
  • CCSCombined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry — check the network app for current rates.

Charging network

Powerpump

Operates 49 stations in the DOE registry — view the full network →

Location

Address
1360 W 2300 N St
State
Utah
ZIP
84116
Coordinates
40.81699, -111.93001

Within ~15 km

Nearby charging

Frequently asked questions

How many chargers does Applied Excavation have?

The station has 8 charging ports: 2 DC fast · 6 Level 2.

What connectors does Applied Excavation have?

Available connectors: J1772, CCS.

Is charging at Applied Excavation free?

No pricing is listed in the DOE registry for this station — check the Powerpump app for current rates.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 349793, weekly full pull.